Chapter 12 Electricity Systems

How do the location and timing of electricity use shape resulting emissions? Distinguish annual accounts, operational dispatch, and capacity expansion before judging whether time-of-use signals can estimate the emission change of a specific load adjustment.

12.1 Delivery Chain

When a factory decides to use one fewer kilowatt-hour (kWh) of electricity, the first question is which kWh is being avoided: where on the grid was it delivered, and during which hours was it consumed? If the goal is simply to allocate the burden of existing supply to users, the calculation can start from realized generation and emissions. If the goal is to determine which generating units reduce output as a result of saving electricity, the analysis must also examine how supply responds. The discussion below traces electricity backward from the equipment delivery point and then compares system responses across different time horizons.[1]

Reducing consumption by 1 kWh specifies only an energy quantity. If lighting duration, production output, or charging service also changes, the functional equivalence of the two options must be stated explicitly. In the calculations that follow, the timing and magnitude of the demand reduction are written directly into the model and evaluated using independent grid, generation, and unit-level datasets, making it possible to verify exactly which specified change the calculation answers.[2]

Tracing the origin of a unit of electricity requires three coordinates: the voltage level of delivery, the supply region, and the time of use. Voltage determines which network segments the electricity traverses; regional boundaries govern how power plants and interregional exchanges are accounted for; and the clock convention aligns load with the corresponding hourly records. A Norwegian transmission and distribution study illustrates physical delivery chains, U.S. annual and hourly datasets show how generation and consumption are reconciled, and prospective scenarios show how electricity supply shifts when generating capacity can also adjust.[3]

Arvesen and colleagues trace electricity delivery in Norway across the main transmission grid, regional transmission networks, and local distribution networks. Local networks typically operate at 11 or 22 kV before stepping down to 230 or 400 V for ordinary end users, whereas both regional and main transmission grids include 132 kV lines and large industrial consumers may connect further upstream. Identifying which grid infrastructure serves a given load therefore requires reading nominal voltage values together with the functional role of each network segment.[4]

Once the delivery path is established, the inventory must account both for the electricity lost along the way and for the activities required to build and maintain the network. The Norwegian study compiles inventories for lines, conductors, cables, transformers, and switchgear across manufacturing, transport, construction, inspection, and end-of-life, while assuming operational leakage from equipment containing sulfur hexafluoride (SF₆). Asset lifetimes govern how construction burdens are amortized across annual delivered electricity. Network materials and direct emissions should be reported separately from the additional generation required to compensate for line losses.[5]

Evaluating line losses begins by checking which quantity serves as the denominator. Let Ein denote network input and Eout denote network output. If the loss rate is defined on an input basis as ℓ = (Ein − Eout) / Ein, delivering 1 megawatt-hour (MWh) requires an input of 1 / (1 − ℓ) MWh, and the extra ℓ / (1 − ℓ) MWh represents the energy lost. If a dataset instead defines the loss rate relative to output, the loss per delivered MWh equals that loss rate multiplied by the delivered quantity.[6]

The Norwegian study's supporting information confirms this conversion. For 2011 local distribution operated by NTE Nett in Nord-Trøndelag, the input-based loss rate is 6.3%. Converting on that denominator gives approximately 67.24 kWh of compensating losses per delivered MWh, which the original supplement lists as 67 kWh. Applying the same conversion to the 1.6% regional transmission loss rate yields approximately 16.26 kWh, listed as 16 kWh in the supplement. Both pairs match within the published table's rounding precision, and the supplement links these loss inputs to the Norwegian electricity mix. This recalculation verifies only the loss-reference conversion, not the full life cycle result of the network.[7]

In the Norwegian example, the two "per delivered MWh" figures are each referenced to the output of their respective network segments. Because some customers withdraw power upstream, the total electricity passing through the regional and local grids differs. Stepping backward from a low-voltage delivery point therefore requires linking each upstream segment's output to the next segment's input while explicitly tracking intermediate withdrawals and injections. Sequential multiplication of segment delivery ratios applies only along an unbranched path with no intermediate injections.[8]

Mapping the same physical delivery chain into a life cycle inventory (LCI) database requires checking the database's own activity classifications. In ecoinvent v3 as documented by Treyer and Bauer, high, medium, and low voltage are defined as above 24 kV, 1–24 kV, and below 1 kV, respectively, with transformation activities linking adjacent voltage markets. Same-voltage transmission, voltage transformation, infrastructure, and losses are modeled separately. Thus, the 11 or 22 kV lines termed local distribution in the Norwegian study do not fall into ecoinvent's low-voltage class; practitioners must verify network role, specific process dataset, and reference voltage together.[9]

A geographic label on a database market does not guarantee that voltage-specific losses come from local measurements. The ecoinvent v3 methodology differentiates regions using local total-loss statistics, but when voltage-level breakdowns are unavailable, it borrows Swiss shares to disaggregate total losses across voltage tiers. The resulting tier-specific losses therefore depend on those borrowed shares, and determining actual local losses at each voltage level requires local disaggregated data.[10]

12.2 Electricity Accounts

With the delivery chain clarified, annual generation accounts can be examined at the power-plant end. The U.S. Environmental Protection Agency (EPA) Emissions & Generation Resource Integrated Database (eGRID2023) sums plant-level emissions by region and divides by annual net generation, which already deducts in-plant electricity use. Estimating emissions for electricity delivered to end users still requires accounting for transmission and distribution losses and identifying the consumption mix. A regional output emission rate reflects only the generation and emissions inside that ledger; imports, exports, fuel extraction and transport, and power-plant construction must be addressed separately.[11]

The numerator also requires checking which emission column is used. eGRID retains both unadjusted and adjusted emissions and relies on adjusted emissions for regional summaries: following its edition rules, it removes biomass carbon dioxide (CO₂) and allocates out the portion of combined heat and power (CHP) emissions attributable to useful thermal output. If two tables adopt different attribution rules, differences in their reported figures cannot be interpreted solely as changes in the generating fleet.[12]

Recalculating the eGRID2023 Revision 2 workbook for the ERCT subregion (Electric Reliability Council of Texas, ERCOT All) checks this arithmetic directly. The subregion row reports approximately 477,137,386.101 MWh of net generation and 175,076,531.801 U.S. short tons of CO₂. Using 2,000 pounds (lb) per short ton to convert emissions to pounds and dividing by net generation yields approximately 733.8621 lb CO₂/MWh, matching the published value of 733.862 lb CO₂/MWh. This check confirms the annual average and its display precision for the workbook's numerator and denominator, whereas estimating how much CO₂ is avoided by saving electricity in a specific hour requires response data.[13]

Workbooks carrying the same 2023 data year can still differ by revision. Revision 2 of eGRID2023 restored negative net generation values that had previously been zeroed out and updated plant matching and aggregation fields, so recalculations must preserve those negative values. The data year identifies when generation and emissions occurred, whereas the revision number specifies how the workbook aggregated them.[14]

eGRID estimates grid gross loss from a separate interconnection-level annual balance with its own denominator. Here, total disposition combines sales, electricity furnished without charge, utility own use, and losses; after deducting net interstate exports, the ERCOT interconnection row equals approximately 477,196,420.049 MWh. Subtracting approximately 33,326,181.969 MWh of direct use that bypasses the grid yields the loss-rate denominator. Dividing estimated losses of approximately 18,707,069.898 MWh by (disposition excluding net exports − direct use) gives 4.2145%, published as 4.2%. Because this denominator is a distinct accounting quantity, it cannot be replaced with the ERCT power-plant net generation figure above.[15]

The published eGRID loss figures also contain a source discrepancy. Both the eGRID2023 Technical Guide and the Revision 2 workbook report 4.2% for ERCOT and 4.1% for the Western interconnection, whereas the cited EPA FAQ webpage reverses those two values. This analysis adopts the values explicitly bound to the Technical Guide and Revision 2 workbook while recording the FAQ discrepancy, as the webpage's update timestamp does not explain the transposition. Even after selecting a loss factor, loss adjustment scales only the required electricity quantity; the origin of imported power still requires separate investigation.[16]

Annual totals conceal when a region relies on external supply during the day. In U.S. Energy Information Administration (EIA) Form EIA-930 balancing-authority records, demand is derived as reported net generation minus total net interchange, where net exports are positive and net imports are negative. Each row reports hourly average power in megawatts (MW) stamped at hour-ending, so multiplying by one hour yields hourly energy in MWh. This ledger covers the bulk wholesale grid visible to the balancing authority, whereas distribution-connected resources and retail end-use meters have separate boundaries.[17]

Two hourly records from the EIA-930 balancing authority labeled ERCO contrast net exports with net imports. For the hour ending at 01:00 local time on January 1, 2023, ERCO recorded 36,539 MW of net generation and 710 MW of net exports, giving 35,829 MW of demand. For the hour ending at 09:00 local time on July 1, 2023, it recorded 51,829 MW of net generation and −81 MW of net interchange, giving 51,910 MW of demand. The negative interchange in the second row indicates net imports—making demand exceed local net generation—rather than "negative electricity use."[18]

Constructing a full-year hourly balance requires auditing missing reports. Selecting 2023 by local data date for ERCO yields 8,760 non-empty hourly values each for demand and net generation, while total net interchange has 6 missing entries alongside 187 explicit zero reports. Even in hours where all three fields are populated, non-zero balance residuals can appear. Missing interchange can be back-calculated from the other two quantities for the same hour, provided the imputed status is documented, and sums over populated records alone must be kept distinct from complete annual totals.[19]

Joining two hourly tables requires a reliable time key. In these records, Coordinated Universal Time (UTC) hours are continuous and unique, whereas local clock timestamps repeat at the end of daylight saving time, and the final local hours of 2023 fall on 2024 UTC dates. Merging tables solely on calendar year and local clock hour risks dropped or duplicated matches; analysts must use time-zone-aware keys and state both the year boundary and whether timestamps mark hour-beginning or hour-ending.[20]

Regional alignment must also be verified down to individual power plants. In EPA's AVoided Emissions and geneRation Tool (AVERT), the Texas (TE) region includes the SRO Cogen plant, which eGRID2023 assigns to the Midcontinent Independent System Operator (MISO) balancing authority and the SRMV subregion. Conversely, Tenaska Kiamichi sits in Oklahoma yet is assigned to TE in AVERT and to ERCO and ERCT in eGRID. These two plants alone show that state borders diverge from statistical and modeling boundaries; a region name cannot substitute for verifying the plant lists inside the numerator and denominator.[21]

Some hourly grid products also publish CO₂ estimates. EIA documents that it estimates hourly generation emissions from generation and fuel emission factors and then assigns imports and exports using a multi-regional input-output flow-attribution framework. Using hourly consumption-based emissions therefore requires verifying three steps independently: the electricity balance, the generation-emission estimate, and the trade-attribution rule. Complete records at the first step do not validate the assumptions embedded in the other two.[22]

12.3 Operational Response

If the analytical question is how much emission burden from realized supply is attributed to a user, dividing the relevant emissions by electricity gives an average rate. If the question is which emissions decline when electricity use falls, the calculation must compare two distinct supply states. Having examined the denominators of average accounts above, we now inspect how different response indicators determine which generating units adjust.[23]

eGRID's non-baseload output emission rate approximates which units respond to dispatch using plant capacity factors—the ratio of actual generation to maximum continuous rated output. Plants with capacity factors below 0.2 receive full weight, those above 0.8 receive zero weight, and those in between follow a linear weight declining from 1 to 0. Weighted emissions are divided by weighted generation, with renewable-fuel generation excluded from the calculation. While this rate can serve as a rough proxy for certain energy-efficiency or renewable interventions displacing fossil generation, identifying which units actually respond in a given hour requires additional evidence, and maintenance outages also shift capacity factors.[24]

Siler-Evans and colleagues (2012) paired hour-to-hour changes in fossil gross generation with corresponding changes in emissions, estimating average marginal emission factors from regression slopes. Their dataset drew on 2006–2011 Continuous Emission Monitoring Systems (CEMS) records grouped by North American Electric Reliability Corporation (NERC) region, without tracking interregional imports or exports and assuming that uncovered non-fossil sources do not respond. Because these estimates capture statistical associations in historical fluctuations, verifying the concrete effect of a specific energy-saving intervention still requires matching engineering and power-system evidence.[25]

Graff Zivin, Kotchen, and Mansur shifted the explanatory variable to hourly consumption, regressing interconnection-wide emissions on 2007–2009 Federal Energy Regulatory Commission (FERC) Form 714 hourly load data. In the Eastern Interconnection, consumption in one region can thus be linked to emission changes across the shared grid without restricting the response to local generators. Their weekday regressions include hour-of-day by sample-month fixed effects, and the authors justify demand exogeneity on the ground that retail customers generally do not face real-time wholesale prices. That causal identification argument must still be evaluated against whether the specific decision problem satisfies the same assumption.[26]

One empirical approach links emission differences to changes in fossil gross generation, whereas the other links emissions to changes in end-use consumption. Siler-Evans and colleagues caution that even narrow statistical confidence intervals may omit data errors, model-specification choices, and transferability risks, while also noting complications from hydroelectric intertemporal shifting and wind curtailment. Changing the explanatory variable in the second study provides a valuable cross-check, yet because both studies rely in part on the same CEMS emission records, their estimation errors can remain correlated.[27]

Wholesale market reports also describe a fuel as being "on the margin." The Southwest Power Pool (SPP), for example, reports marginal fuel shares by the fraction of intervals in which each fuel sets the market price, whereas regression studies estimate each fuel's share of incremental energy generation. Knowing how frequently a fuel sets price does not by itself tell us how many MWh it adds or what emissions result; connecting price-setting frequency, incremental energy, and emission changes requires separate evidence for each link.[28]

AVERT organizes historical unit-level operating relationships into an hourly evaluation tool. Here we run the 2023 Texas (TE) regional dataset and native calculation functions from EPA AVERT Web Edition v4.3.0, where TE covers generating units in both Oklahoma and Texas. The data file tabulates unit responses across regional load bins—using one annual set of curves for generation and separate May–September and non-summer curves for pollutants and heat input—and evaluates both baseline and perturbed load profiles to sum the state difference. Because AVERT estimates operational response from existing unit relationships, dispatch under full transmission constraints requires a separate model.[29]

AVERT's load coordinate is the regional fossil load—in MW—that must be met by fossil generating units covered in the emissions database, multiplied by one hour to obtain hourly energy. Nuclear, hydroelectric, wind, and solar units do not enter these unit-level generation and emission totals directly; instead, energy efficiency or new renewable supply is treated as a request to reduce fossil load. The example below follows this convention without separately modeling non-fossil output or import responses.[30]

We begin with a uniform hourly reduction: subtracting 1 MWh of end-use electricity in every hour of the 2023 dataset, for a total of 8,760 MWh across the year. No solar, wind, storage, or electric-vehicle profiles are added, and the calculation runs on the full TE region without scaling by state shares. This input is a conditional model test rather than an implemented efficiency project, while a zero-change profile provides a baseline check within the same code.[31]

To translate end-use reductions into fossil-load requests, the native AVERT client applies the TE loss parameter 0.0457913819880058 via 1 / (1 − ℓ). Each 1 MWh of end-use reduction thus requests approximately 1.047989 MWh of fossil-load reduction, summing over the year to −9,180.3824 MWh (where negative values denote scenario minus baseline). Because this intermediate input already incorporates the program's line-loss adjustment, it must not be treated again as unadjusted end-use electricity once it enters the calculation core.[32]

The documentation behind that loss formula also warrants scrutiny. The AVERT v4.3 User Manual likewise writes the conversion as division by 1 − ℓ, yet its footnote defines the loss factor as (net generation + net imports − sales) divided by sales. If the denominator were indeed sales, energy balance would require multiplying by 1 + ℓ instead. Here we document the exact transformation executed by the software without resolving how the footnote definition reconciles with the parameter's derivation; its denominator must also be checked separately from eGRID's grid gross loss.[33]

Inside the calculation core, each hourly requested load is located between two adjacent load bin edges L₀ and L₁. If a unit's tabulated outputs at those edges are y₀ and y₁, linear interpolation at load L gives y(L) = y₀ + (y₁ − y₀)(L − L₀) / (L₁ − L₀). Evaluating both baseline and perturbed loads, aggregating each series to monthly totals, and taking the difference means that an identical end-use reduction yields different responses depending on the starting load bin, whether the change crosses a bin boundary, and each unit's curve.[34]

The native functions return an annual fleet-wide generation change of −9,187.9183 MWh and a direct CO₂ change of −5,672.7223 U.S. short tons. The code aggregates unit results into monthly regional totals, subtracts baseline from scenario for each month, and sums the monthly differences. The modeled generation change differs from the requested fossil-load change by approximately −7.5359 MWh because unit-level interpolation does not constrain the sum of individual unit responses in each bin to equal the requested load; this residual must not be interpreted as an additional line loss.[35]

That single emission change can be normalized by two different electricity denominators. Converting at 1 U.S. short ton = 907.18474 kg gives a modeled CO₂ reduction of approximately 5,146,207.11 kg. Dividing by the specified 8,760 MWh end-use reduction yields approximately 587.47 kg/MWh, whereas dividing by the magnitude of the modeled generation reduction yields approximately 560.11 kg/MWh. The first rate is per MWh saved at the end user, and the second is per MWh avoided at the modeled generators; the gap reflects only the choice of denominator.[36]

Passing a zero-change profile into the code tests whether identical baseline and scenario states produce any spurious non-zero difference, while checking whether every hour stays inside the interpolable load-bin range flags skipped or unevaluable records. These checks establish internal numerical consistency, not real-world accuracy. The model can also predict emission increases at a few individual units even when total load drops; confirming whether a real intervention triggers that operating mechanism still requires empirical observation.[37]

Next, two separate single-hour tests each reduce end-use electricity by 100 MWh in a single hour—labeled July 1 at 03:00 and July 1 at 16:00 in the Regional Data File (RDF)—while leaving all other hours unchanged. On AVERT's fossil-load coordinate, those two hours sit at 34,246 MW and 45,576 MW, respectively. Although both runs request the exact same fossil-load reduction, modeled CO₂ changes are −60.2830 and −56.6234 short tons, or approximately 546.88 and 513.68 kg per specified MWh of end-use reduction. Entering the model with the same energy reduction at two different operating points produces different responses.[38]

Looking at criteria pollutants reverses the ranking between the two hours. In the same 03:00 and 16:00 tests, modeled sulfur dioxide (SO₂) changes are approximately −34.55 and −56.28 lb, and nitrogen oxides (NOₓ) changes are approximately −18.74 and −105.91 lb—so the 16:00 reduction avoids larger masses of both pollutants. Masses of different pollutants cannot be added directly, nor do these mass changes alone constitute a particulate-matter exposure, human-health, or multi-category life cycle impact assessment.[39]

These two single-hour profiles were evaluated directly through AVERT v4.3.0's native numerical functions; the web interface described in the v4.3 User Manual does not accept arbitrary user-supplied hourly load-change series. Before using such results to compare conservation options, one must verify that both 100 MWh reductions deliver the same final service and can feasibly be executed in the target hours. Linking the results to EIA records also requires aligning the RDF clock with UTC hours. Only after those conditions are verified does comparing the resulting CO₂ rates become meaningful.[40]

Load shifting requires placing both the decrease and the increase inside one complete schedule. When a service can be deferred, the intervention combines reduced consumption in the original window with added consumption in another window, and the comparison quantity is the emission difference between the complete shifted schedule and the baseline schedule. The two single-hour reduction runs above each answer only what happens when load drops in that hour; one cannot simply flip the sign of one reduction and treat it as a load increase without verification. Both schedules must deliver the same service within the allowed deadline, while equipment efficiency changes the electricity required and grid or storage losses change the generation required—each tracked at its own delivery point.[41]

Steinsultz and colleagues constructed an empirical benchmark from ERCOT operating records, using 2020–2022 data for system-wide comparisons. They summed hourly CO₂ emissions across units covered by EPA's Clean Air Markets Program Data (CAMPD) and modeled hourly emission changes as a controlled function of changes in wind High Sustained Limit (HSL) across node groups. HSL is a reported measure of available wind output typically set from short-term forecasts, whereas actual generation is also affected by dispatch and curtailment; the study treats a drop in available wind as a proxy for a net-load increase, interpreting the two with opposite signs. Although grounded in operating records, applying this benchmark to a specific user's load change still requires verifying that the response matches at the same node and system state.[42]

Using each signal's own 10th percentile as a cutoff, the study compared fitted benchmark responses in the lowest decile against the remaining hours. Within the sample, locational marginal prices and heat-rate signals also identified a low-decile group with lower benchmark emissions. Yet usefulness for screening does not mean a signal's numerical value equals the CO₂ change per added MWh: prices are still denominated in currency per MWh, and heat-rate methods still require checking whether their implied emission rates match the benchmark magnitude. In the largest node group, moreover, neither heat-rate nor price signals varied monotonically with the benchmark across quantiles. A lower average in the bottom group therefore guarantees neither the ranking of an arbitrary pair of hours nor the exact kilograms of CO₂ saved by a specific load shift.[43]

Testing emission-rate magnitudes reveals a further distinction. Across quantile curves in the study's largest node group, dispatch and statistical models tracked both the ordering and magnitude of the benchmark more closely, though they still exhibited downward bias at the low end and upward bias at the high end, respectively. By contrast, the average emission signal did not separate a favorable low-response group as clearly as the other signals. Helping screen low-response hours, matching benchmark rate magnitudes, and accurately predicting the emission change of a concrete schedule are progressively stricter requirements; success at one level does not guarantee performance at the next.[44]

Nilges and colleagues examine the problem from the dispatch-model side: over how large a demand change does a marginal emission rate computed around a given state remain valid? In a linear dispatch model with fixed costs, capacities, and emission factors, they identify a cost-optimal dispatch solution—specifying which units remain free to adjust and which units or transmission lines are binding—and determine how far demand can move before that optimal basis changes. Within that guaranteed validity range, the finite emission difference of the selected dispatch solution equals the marginal rate times the load change. Moving beyond that range means only that the guarantee no longer holds; it does not automatically imply that the emission rate changes, let alone that the net difference reverses sign. The allowable load-increase and load-decrease bounds reported in the paper belong to specific nodes, hours, and directions in that model rather than serving as universal grid thresholds.[45]

Nilges and colleagues report validity ranges for perturbing one demand coordinate at a time. Applying that concept to a load shift requires checking a complete signed perturbation containing both a decrease and an increase. When the two endpoints are independent and each stays within its valid direction and bound, the two baseline rates can be combined directly; even in a coupled model, those rates still hold if the same linear response relationship generating both baseline rates remains intact along the entire joint path. Otherwise, the two complete schedules must be compared directly rather than mechanically stitching together two single-coordinate intervals. A lossy battery, for instance, must specify actual charging and discharging energies, power trajectories, and a shared initial and final state of charge rather than assuming an equal-energy shift; likewise, if validity bounds are defined in MW, specifying only total shifted MWh is insufficient.[46]

A stylized author-constructed task isolates how shift magnitude alters the outcome. Consider 10 divisible jobs, each consuming 1 MWh in either window with identical equipment efficiency and output quality, all permitted to finish by the end of the second window. Both windows share the same delivery point, last 1 hour, and have zero grid or storage losses. In the baseline schedule, all 10 jobs run in the first window alongside a fixed 5 MWh load in the second window. Shifting q MWh yields demands of (10 − q) MWh and (5 + q) MWh in the two windows, still completing 10 jobs and consuming 15 MWh in total. These service-equivalence and lossless assumptions are explicit boundary conditions of the example.[47]

Each window has two available supply resources dispatched in merit order—lower cost first until capacity is exhausted, then higher cost. In the first window, the cheaper source supplies up to 5 MW at 100 kg CO₂/MWh and the costlier source supplies up to 10 MW at 700 kg CO₂/MWh. In the second window, capacities are 10 MW and 5 MW at emission rates of 300 and 600 kg CO₂/MWh, respectively. Maximum energy in each window equals power capacity multiplied by its 1-hour duration. The two windows are independent, omit startup, ramping, and storage constraints, and compare direct CO₂ only.[48]

At the start of shifting, each MWh removed from the first window avoids output from the 700 kg CO₂/MWh resource, while each MWh added to the second window calls on the 300 kg CO₂/MWh resource, giving a local net rate of −400 kg CO₂/MWh shifted. Shifting 5 MWh changes emissions by −3,500 kg in the first window and +1,500 kg in the second, for a complete net difference of −2,000 kg CO₂ relative to the baseline schedule.[49]

Increasing the shift to 10 MWh remains feasible, but the active supply conditions change: once the first window's high-emission resource is fully backed down, further reductions cut the 100 kg/MWh source, and once the second window's cheaper source reaches capacity, extra load calls on the 600 kg/MWh source. Total emissions rise from 5,500 kg CO₂ in the baseline to 6,000 kg CO₂ under the 10 MWh shift—a net increase of +500 kg CO₂—whereas extrapolating the initial net rate would falsely predict −4,000 kg CO₂. At a 9 MWh shift, the two windows' changes cancel exactly at 5,500 kg CO₂, showing that crossing the initial 5 MWh validity bound does not immediately reverse the sign to a net increase.[50]

Now change only the second window's costlier resource from 600 to 300 kg CO₂/MWh so that it matches the cheaper resource. Once the first resource in the second window hits its capacity limit, the second resource must still supply the extra load, yet the incremental emission rate per added MWh stays unchanged. A change in binding constraints or active generators therefore does not automatically invalidate a numerical emission rate. Even so, only the second window's factor stays constant; the first window still switches rates, so the full shift cannot follow the initial net rate throughout, and shifting 10 MWh in this control case yields a complete net difference of −1,000 kg CO₂.[51]

A single load-shifting proposal therefore involves three distinct, separately testable judgments. Observed low-response time groups can suggest candidate schedules; once both endpoints and system constraints are specified, a fixed dispatch model can compare the two complete schedules; and claiming that the modeled difference will occur in reality still requires evidence matching the node, timing, and intervention. The stylized example isolates how shift magnitude alters modeled results. In the Cambium discussion that follows, weighting hourly rates by load changes produces a coefficient-based response estimate; whether that weighted sum equals the joint dispatch change of a specified finite plan still requires verification rather than being guaranteed by the summation formula.[52]

12.4 Capacity and Long-Run Response

When a demand change persists long enough to influence power-plant investments or retirements, the fixed generating fleet assumed above can itself evolve. Distinguishing short-run from long-run estimates begins by checking whether the model allows capital stock to adjust: a figure labeled with a future year may still represent a short-run dispatch estimate on a fixed future fleet. We next examine a scenario framework that allows both operations and generating capacity to respond.[53]

Cambium 2024 links capacity expansion to hourly dispatch through a chain of coupled models. The Regional Energy Deployment System (ReEDS) models generation and transmission buildout, retirements, and planning constraints; the Distributed Generation Market Demand (dGen) model projects behind-the-meter photovoltaics; the Probabilistic Resource Adequacy Suite (PRAS) checks resource adequacy; and PLEXOS solves hourly unit commitment and dispatch given the resulting capacity. Here "2024" denotes the release vintage, while the annual table values examined below come from the 2025 simulation year.[54]

Cambium's long-run marginal emission rate (LRMER) is derived from two full model runs: a baseline and a perturbed case with higher end-use demand. End-use electricity demand across the modeled footprint is scaled upward while preserving its load shape—by 1% in the 2025 simulation year and by 5% in all other solved years. Both ReEDS and PLEXOS are re-solved so that operations and capacity can co-evolve before changes are attributed to regions and hours. LRMER therefore estimates the response to a finite national-scale perturbation rather than a local partial derivative from adding 1 kWh in a single state and hour.[55]

Generation differences between the two runs must then be allocated to consuming regions. Cambium allocates technology-level generation increases using network flows under a complete-mixing assumption at each node and nets out corresponding decreases. Whenever a technology's net change in an hour is negative, the calculation excludes it from that hour's marginal mix on the ground that the decrease may stem from investment or operational shifts driven by other hours rather than the hour's incremental load. Because those removed decreases are not reassigned to the hours that actually induced them, the published metric embeds this attribution choice.[56]

Two resource types require tracing back to earlier hours. Storage discharge originates from prior charging and incurs round-trip efficiency losses; Cambium approximates its source using the receiving region's monthly mix of non-storage, non-energy-limited generation, adjusted for round-trip efficiency. Energy-limited resources such as hydropower may either add net energy or shift existing energy across hours; the method inspects each technology's monthly net change to separate incremental energy from shifted generation and approximates replacement generation for the shifted portion from the source region's monthly mix without applying storage losses. After physical attribution, state clean-energy portfolio requirements are enforced through an averaged emission-attribute transfer—without tracking individual certificates—before finally converting rates to end-use electricity.[57]

The published annual electricity table can be checked for approximate balance. Taking the MidCase scenario, ERCOT region, and 2025 simulation year from the same release package, regional generation of 438,493,630.0 MWh plus 412,059.4 MWh of imports minus 1,208,316.6 MWh of exports equals 437,697,372.8 MWh. Subtracting the tabulated busbar load of 437,697,380 MWh leaves a residual of −7.2 MWh. Small as it is, that residual should be retained: published numbers verify only approximate balance and cannot reconstruct internal solver precision.[58]

Whereas the previous check reconstructed busbar load from generation and trade, we can also sum the components of busbar demand from the same row: 425,158,500.0 MWh of busbar electricity serving end-use load, 4,366,699.0 MWh of interregional transmission losses, 8,168,517.0 MWh of battery charging, and 3,672.7 MWh of pumped-hydro charging. Those four terms exceed the tabulated busbar load by 8.7 MWh, leaving a second small residual whose cause cannot be resolved from displayed values alone. End-use consumption also includes behind-the-meter photovoltaics—electricity generated and consumed on the customer's side of the meter—and the tabulated busbar load serving end use scales that behind-the-meter output by distribution losses into a busbar-equivalent quantity. Because behind-the-meter generation never traverses the distribution grid, its busbar-equivalent component cannot be counted as metered grid purchases, nor can total busbar load—which includes transmission losses and storage charging—be treated as delivered end-use electricity.[59]

Moving from the busbar to end users brings in the distribution layer. In the same row, end-use electricity equals 409,876,104.3 MWh, which is 15,282,395.7 MWh—about 3.5945%—below the busbar electricity serving end use. That difference represents distribution-level losses, distinct from the separately reported interregional transmission losses. Cambium also distinguishes average from marginal distribution losses, applying average losses to average and long-run metrics and marginal losses to short-run metrics. Factors already published per end-use MWh must not be multiplied a second time by a delivery-loss adjustment.[60]

Delivery boundaries also shift direct CO₂ emission rates. In this scenario row, the generation-weighted average is 235.2 kg CO₂/MWh generated, whereas the consumption-based end-use average is 249.7 kg CO₂/MWh end use. Bridging those two numbers involves imports and exports, storage sourcing and attribution rules, and distribution-loss conversion, so dividing the generation rate by a single delivery ratio cannot reconstruct the end-use rate—nor can either scenario figure be treated as an updated version of the historical eGRID regional rate for the same system.[61]

Expanding the inventory boundary adds precombustion processes and converts methane (CH₄) and nitrous oxide (N₂O) into carbon dioxide equivalent (CO₂e). Under this broader scope in the same MidCase row, the end-use average emission rate is 307.5 kg CO₂e/MWh, the short-run marginal emission rate is 757.8 kg CO₂e/MWh, and the long-run marginal emission rate is 547.3 kg CO₂e/MWh. All three share the same end-use denominator: the first attributes scenario supply emissions to consumption, the second estimates operational change with fixed capital, and the third allows capacity to adjust with load. Selection depends on the analytical question; relative magnitude alone never proves one model more accurate than another.[62]

The greenhouse-gas aggregation behind that long-run metric can be checked term by term. In the Cambium 2024 workbook for ERCOT, 2025, and MidCase LRMER, the direct combustion components per end-use MWh are 409.1 kg CO₂, 15.5 g CH₄, and 1.99 g N₂O. Converting grams to kilograms and weighting by the workbook's 100-year global warming potentials (GWP)—1 for CO₂, 29.8 for CH₄, and 273 for N₂O—gives 410.10517 kg CO₂e. Applying the same weights to the precombustion components of 41.5 kg CO₂, 3,209.1 g CH₄, and 0.19 g N₂O yields 137.18305 kg CO₂e.[63]

Summing the combustion and precombustion equivalents gives 547.28822 kg CO₂e/MWh, matching the published 547.3 kg CO₂e/MWh to one decimal place. This arithmetic verifies how individual gas masses combine into the reported metric without re-solving the capacity or dispatch models. Although fuel extraction, processing, transport, and fugitive emissions enter the precombustion term, plant construction, non-combustion operation and maintenance, and decommissioning remain outside the boundary, so this CO₂e figure cannot be shortened to a complete life cycle impact of electricity.[64]

Altering future scenario assumptions changes the modeled rate substantially. Switching to the low renewable-energy cost and high natural-gas price scenario for the same region and 2025 simulation year raises the long-run marginal metric to 638.4 kg CO₂e/MWh—91.1 kg CO₂e/MWh above MidCase. Because that scenario varies technology costs, performance, and fuel assumptions together, the gap cannot be attributed to a single price parameter. Such comparisons contrast conditional futures rather than proving which pathway the real grid will follow.[65]

Applying an annual rate to a specific intervention first requires knowing when load changes. If hour h experiences a demand change Δqₕ under a response rate mₕ, the total emission change is ΣmₕΔqₕ; dividing by total net energy change to obtain a unit rate is valid only when net energy change is non-zero, whereas load shifting can alter emissions while leaving net electricity use unchanged. Gagnon and Cole compare distinct load shapes within the same modeling family precisely to examine this temporal weighting. Because Cambium uses standard time, hour-beginning timestamps, and a 2012 weather and calendar year, its timestamps must be converted before aligning with EIA's 2023 hour-ending records, and annual averages must be checked for their aggregation rules.[66]

A further discrepancy can be checked directly from the annual loss formula. The Cambium 2024 documentation denotes annual variable distribution losses as Lv,annual and annual busbar load as Qannual, printing the coefficient as Lv,annual / Qannual² multiplied by each hour's Qₕ². Summing across all hours recovers the prescribed annual loss only if the denominator is ΣQₕ², whereas Qannual² equals (ΣQₕ)² and generally differs. The cited Borenstein and Bushnell working paper uses the sum of squared hourly loads. Inspecting the printed equation identifies this mismatch, though which expression the generating code actually executed remains to be verified, and published annual tables are not altered on that basis.[67]

12.5 Life Cycle Connections

Connecting an electricity change to a full life cycle inventory requires linking responding technologies to their background supply chains. Vandepaer and colleagues (2019) construct long-term marginal mixes from growing, unconstrained technologies in prospective scenarios and link them into ecoinvent background processes, voltage markets, and impact assessment methods. Because U.S. regional shares are disaggregated from national projections, fine geographic labels do not prove locally measured responses. This mix-construction rule also differs from Cambium's joint capacity-and-dispatch re-optimization, so comparing the two requires aligning background database versions, delivery boundaries, and impact assessment methods.[68]

Bringing the distinction between average and marginal electricity supply back to the recurring wall-service teaching case reveals how grid-accounting choices alone can overturn a comparative verdict without changing a single physical coating coefficient. Holding all service and process quantities from Wall Service Comparison fixed across the 100 m² / ten-year service (20 kWh for Paint A; 30 kWh for Paint B on a smooth substrate and 50 kWh including substrate preparation on a rough substrate), consider three author-invented pedagogical grid intensities in the companion teaching extension: an attributional annual average grid at 0.30 kg CO₂/kWh, a fossil-peaking marginal grid at 0.65 kg CO₂/kWh, and a clean-marginal grid at 0.08 kg CO₂/kWh. On a smooth wall, the average grid places Paint B minus Paint A at +1.562 kg CO₂-eq (29.529 vs. 27.967), still inside the predeclared ±4 kg CO₂-eq tolerance band. Switching to the fossil-marginal grid widens the gap to +5.062 kg CO₂-eq (40.029 vs. 34.967), crossing outside ±4 and establishing a decisive advantage for Paint A. Switching instead to the clean-marginal grid crosses the 0.1438 kg CO₂/kWh break-even point and reverses the sign to −0.638 kg CO₂-eq (22.929 vs. 23.567), leaving Paint B lower. On a rough wall, by contrast, Paint B’s mandatory preparation step and 30 kWh electricity penalty keep the difference outside tolerance across all three grids—from +6.524 kg CO₂-eq under the clean margin to +23.624 kg CO₂-eq under the fossil margin—leaving Paint A decisively lower throughout. Grid-accounting conventions therefore control both sign and significance when alternatives sit near parity, whereas large physical service or preparation penalties dominate the supply-model choice.[69]

Different claims require different validation evidence. Re-running native code verifies numerical pathways under fixed inputs; comparing against a full re-solve of the same model tests internal approximations; and testing against empirical data requires aligning space and time while showing that the observed proxy represents the target response. For example, Koebrich and colleagues' 2023 preprint evaluated earlier Cambium hourly signals against 2021 observational proxies, which does not yet test the long-run capital counterfactual of the 2024 release examined here; moreover, the authors' affiliation with WattTime—which provides competing emission signals—should be disclosed alongside the evaluation design.[70]

Each of the four external electricity datasets below measures a distinct quantity; using any of them to estimate emissions still requires verifying the region, time period, and delivery point.

DatasetQuestion Addressed Here
eGRID2023 Revision 2Annual average direct CO₂ emission rate of regional power plants, with annual net generation as the denominator.
EIA-930 (2023)Hourly average power (MW) for generation, demand, and interregional interchange, multiplied by one hour to obtain energy (MWh), stamped at hour-ending.
AVERT 4.3.0Modeled operational response of existing generating units in the 2023 Texas (TE) region when end-use electricity demand changes.
Cambium 2024Modeled long-run response when a demand perturbation allows both operation and generating capacity to adjust; the example here uses the 2025 simulation year.

Even when expressed per unit of the same electricity metric, annual emission attribution, hourly energy balance, unit-level operational response, and long-run scenarios answer different questions. Comparing emission rates across these datasets also requires checking whether each denominator reflects electricity generated at power plants or electricity delivered to end users.

Tracing an electricity intervention to emissions follows a clear sequence: specify how demand changes across hours to deliver the same final service; identify which network segments carry the power and how generation and trade are attributed; and determine whether existing unit dispatch or generating capacity responds. Assessing broader environmental impacts then requires specifying how each emitted substance and resource flow enters impact characterization. The cases above illuminate separate links in that chain; the next chapter turns to recycling, examining what services recovered paper fiber, heat, and electricity deliver and which supply streams they displace.[71]

Reproduction notes for fixed-version AVERT calculations

Notes

  1. Interpretation. Locating a kilowatt-hour at its delivery point; scope bounded to named historical datasets, native models, and explicit assumptions

  2. Synthesis. Locating a kilowatt-hour at its delivery point; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  3. Synthesis. Locating a kilowatt-hour at its delivery point; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  4. Interpretation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

  5. Interpretation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

  6. Calculation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  7. Calculation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

    Caveats: The numerical check does not propagate underlying statistical, parameter, or model-structure uncertainty; displayed decimals reflect tabulated calculation values rather than equivalent measurement or predictive precision.

    Premises referenced (1)

    Download calculation input (v1.0.0)

  8. Interpretation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  9. Interpretation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

  10. Interpretation. How delivery points bring in transmission and distribution activities; scope bounded to named historical datasets, native models, and explicit assumptions

  11. Interpretation. What annual generation accounts include; scope bounded to named historical datasets, native models, and explicit assumptions

    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 2–3, 8, 19, 22–24 (PDF pp. 13–14, 19, 30, 33–35), Sections 2.1, 3.1, 3.1.3.3, and 3.4
  12. Interpretation. What annual generation accounts include; scope bounded to named historical datasets, native models, and explicit assumptions

    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 14–16 (PDF pp. 25–27), Section 3.1.2.1 (biomass CO₂) and Section 3.1.2.2 (combined heat and power electric allocation)
    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 2–3, 8, 19, 22–24 (PDF pp. 13–14, 19, 30, 33–35), Sections 2.1, 3.1, 3.1.3.3, and 3.4
  13. Calculation. What annual generation accounts include; scope bounded to named historical datasets, native models, and explicit assumptions

    • Emissions & Generation Resource Integrated Database (eGRID2023), Revision 2 (Data year 2023; Revision 2 dated 2025-06-12; imperial workbook (alongside the corresponding metric workbook, revision webpage, and release notes)) — Imperial-unit workbook, SRL23!A1:W2, A7:W7 (ERCT / ERCOT All; values in I7, O7, W7)
    • NIST Handbook 44 (2026), Appendix C. General Tables of Units of Measurement (Handbook 44 – 2026, standalone official PDF of Appendix C, 28 pages) — p. C-7 (PDF p. 7), Avoirdupois Units of Mass and footnotes 10–11; p. C-9 (PDF p. 9), Section 4 (paragraphs on underlining and rounding); p. C-17 (PDF p. 17), Units of Mass Not Less Than Avoirdupois Ounces (upper table: short ton row, Avoirdupois Pounds column; lower table: pound and short ton rows, Kilograms column)

    Caveats: The numerical check does not propagate underlying statistical, parameter, or model-structure uncertainty; displayed decimals reflect tabulated calculation values rather than equivalent measurement or predictive precision.

    Premises referenced (2)
  14. Interpretation. What annual generation accounts include; scope bounded to named historical datasets, native models, and explicit assumptions

  15. Calculation. What annual generation accounts include; scope bounded to named historical datasets, native models, and explicit assumptions

    • Emissions & Generation Resource Integrated Database (eGRID2023), Revision 2 (Data year 2023; Revision 2 dated 2025-06-12; imperial workbook (alongside the corresponding metric workbook, revision webpage, and release notes)) — Imperial-unit workbook, GGL23!A1:F2, A4:F4, A7:F7 (ERCOT values in C4, D4, E4, F4)
    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 25–27, 66–67 (PDF pp. 36–38, 77–78), Section 3.5, Table 3-6, and Section 6.9
    Premises referenced (2)
  16. Interpretation. What annual generation accounts include; scope bounded to named historical datasets, native models, and explicit assumptions

    • Frequent Questions About eGRID (Official HTML webpage updated 2026-07-28, accessed 2026-11-06; referencing eGRID2023 #14 and #25) — FAQ 14 (What is Grid Gross Loss), 2023 GGL Estimates table (qualifies)
    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 25–27, 66–67 (PDF pp. 36–38, 77–78), Section 3.5, Table 3-6, and Section 6.9
    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 2–3, 8, 19, 22–24 (PDF pp. 13–14, 19, 30, 33–35), Sections 2.1, 3.1, 3.1.3.3, and 3.4
  17. Interpretation. How hourly balances link generation and demand; scope bounded to named historical datasets, native models, and explicit assumptions

    • About the EIA-930 data (Original HTML fragment accessed 2026-11-06 via the Hourly Electric Grid Monitor About portal, including subsequent reporting rule updates) — About the EIA-930 data: Data Element Descriptions (Demand, Net generation, Total interchange), Data Relationships, and Data Quality
  18. Calculation. How hourly balances link generation and demand; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  19. Calculation. How hourly balances link generation and demand; scope bounded to named historical datasets, native models, and explicit assumptions

    • Hourly Electric Grid Monitor, EIA-930 2023 Balance and companion 930A generator inventory (Data year 2023; separate Jan–Jun and Jul–Dec BALANCE raw CSV files (fixed retrieval snapshot); EIA-930A 2023 XLSX is a separate companion directory) — Jan–Jun CSV, row 1 and rows 60807–65149 (4,343 ERCO rows, including blank interchange row 63269 and non-closing balance example row 61066)
    • Hourly Electric Grid Monitor, EIA-930 2023 Balance and companion 930A generator inventory (Data year 2023; separate Jan–Jun and Jul–Dec BALANCE raw CSV files (fixed retrieval snapshot); EIA-930A 2023 XLSX is a separate companion directory) — Jul–Dec CSV, row 1 and rows 61837–66253 (4,417 ERCO rows, including daylight saving time transition rows 64885–64887 and blank interchange rows 64116, 64319–64320, 64934, 65449)
    • About the EIA-930 data (Original HTML fragment accessed 2026-11-06 via the Hourly Electric Grid Monitor About portal, including subsequent reporting rule updates) — About the EIA-930 data: Time Reporting, Daylight Saving Time Reporting, Imputation, and Data Quality
    Premises referenced (1)
  20. Interpretation. How hourly balances link generation and demand; scope bounded to named historical datasets, native models, and explicit assumptions

    • Hourly Electric Grid Monitor, EIA-930 2023 Balance and companion 930A generator inventory (Data year 2023; separate Jan–Jun and Jul–Dec BALANCE raw CSV files (fixed retrieval snapshot); EIA-930A 2023 XLSX is a separate companion directory) — Jan–Jun CSV, row 1 and rows 60807–65149 (4,343 ERCO rows, including blank interchange row 63269 and non-closing balance example row 61066)
    • Hourly Electric Grid Monitor, EIA-930 2023 Balance and companion 930A generator inventory (Data year 2023; separate Jan–Jun and Jul–Dec BALANCE raw CSV files (fixed retrieval snapshot); EIA-930A 2023 XLSX is a separate companion directory) — Jul–Dec CSV, row 1 and rows 61837–66253 (4,417 ERCO rows, including daylight saving time transition rows 64885–64887 and blank interchange rows 64116, 64319–64320, 64934, 65449)
    • About the EIA-930 data (Original HTML fragment accessed 2026-11-06 via the Hourly Electric Grid Monitor About portal, including subsequent reporting rule updates) — About the EIA-930 data: Time Reporting, Daylight Saving Time Reporting, Imputation, and Data Quality
  21. Synthesis. How hourly balances link generation and demand; scope bounded to named historical datasets, native models, and explicit assumptions

    • Emissions & Generation Resource Integrated Database (eGRID2023), Revision 2 (Data year 2023; Revision 2 dated 2025-06-12; imperial workbook (alongside the corresponding metric workbook, revision webpage, and release notes)) — Imperial-unit Revision 2 XLSX: PLNT23!C1:N2, C9825:N9825, C11411:N11411; UNT23 plant ID/unit ID and PLNT23 plant ID/subregion index columns
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, rdf_TE_2023.json: region, run, regional_load[4347], regional_load[4360], and data.generation
    • About the EIA-930 data (Original HTML fragment accessed 2026-11-06 via the Hourly Electric Grid Monitor About portal, including subsequent reporting rule updates) — About the EIA-930 data: Data Element Descriptions (Demand, Net generation, Total interchange), Data Relationships, and Data Quality
    Premises referenced (2)
  22. Interpretation. How hourly balances link generation and demand; scope bounded to named historical datasets, native models, and explicit assumptions

    • About the EIA-930 data (Original HTML fragment accessed 2026-11-06 via the Hourly Electric Grid Monitor About portal, including subsequent reporting rule updates) — About the EIA-930 data: Estimated CO2 emissions and Data Quality of Hourly CO2 Emissions
  23. Interpretation. Why average rates and operational responses are different estimands; scope bounded to named historical datasets, native models, and explicit assumptions

    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 19–21 (PDF pp. 30–32), Section 3.1.3.3 (non-baseload output emission rates, linear weighting formula, intended use, and exclusion of renewable-fuel generation)
    • Marginal Emissions Factors for the U.S. Electricity System (Environ. Sci. Technol. 46(9):4742–4748, published online 2012-04-16; typeset proof (pp. A–G) bearing the same DOI and companion XLSX released by the researchers' institution (not verified byte-identical to the final published PDF)) — Proof, p. B (PDF p. 2), Data, Average MEFs hour-to-hour difference equation, and text following Figure 1
  24. Interpretation. Why average rates and operational responses are different estimands; scope bounded to named historical datasets, native models, and explicit assumptions

    • Technical Guide for eGRID2023 (Data year 2023; Technical Guide accompanying the original 2025-01-15 release; 178-page official PDF) — pp. 19–21 (PDF pp. 30–32), Section 3.1.3.3 (non-baseload output emission rates, linear weighting formula, intended use, and exclusion of renewable-fuel generation)
  25. Interpretation. Why average rates and operational responses are different estimands; scope bounded to named historical datasets, native models, and explicit assumptions

    • Marginal Emissions Factors for the U.S. Electricity System (Environ. Sci. Technol. 46(9):4742–4748, published online 2012-04-16; typeset proof (pp. A–G) bearing the same DOI and companion XLSX released by the researchers' institution (not verified byte-identical to the final published PDF)) — Proof, p. B (PDF p. 2), Data, Average MEFs hour-to-hour difference equation, and text following Figure 1
    • Marginal Emissions Factors for the U.S. Electricity System (Environ. Sci. Technol. 46(9):4742–4748, published online 2012-04-16; typeset proof (pp. A–G) bearing the same DOI and companion XLSX released by the researchers' institution (not verified byte-identical to the final published PDF)) — Proof, pp. B–C (PDF pp. 2–3), Trends in MEFs, Figure 2, and Results column 2 discussion of intervals
  26. Interpretation. Why average rates and operational responses are different estimands; scope bounded to named historical datasets, native models, and explicit assumptions

  27. Synthesis. Why average rates and operational responses are different estimands; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  28. Interpretation. Why average rates and operational responses are different estimands; scope bounded to named historical datasets, native models, and explicit assumptions

  29. Interpretation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/config.js, lines 1–68 (year and regions.TE.rdf)
    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — pp. 80–83 (PDF pp. 86–89), Statistical Analysis, Statistical Output, and Figures 49–50
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/calculations.js, lines 92–117, 129–143, 176–241, 248–310, and 348–365
  30. Interpretation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — pp. 101–102 (PDF pp. 107–108), "What kinds of emission rates…", time horizon, and advanced output in CO₂ short tons
    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — pp. 103–104 (PDF pp. 109–110), "Why…system fossil generation", Monte Carlo totals question, and "Can AVERT capture transmission constraints…"
  31. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/controllers.js, lines 45–65 (emissions.calculate) (context)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/impacts.ts, lines 561–656 and 665–751 (calculateHourlyImpacts and calculateHourlyChangesValidation)
    Premises referenced (1)
  32. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/config.ts, lines 214–222 and 415–424 (lineLoss.texas and regions.TE)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/impacts.ts, lines 561–656 and 665–751 (calculateHourlyImpacts and calculateHourlyChangesValidation)
    Premises referenced (1)
  33. Interpretation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — pp. 18–19 (PDF pp. 24–25), footnotes 32–35, equations, and Table 2 (qualifies)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/config.ts, lines 214–222 and 415–424 (lineLoss.texas and regions.TE)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/impacts.ts, lines 561–656 and 665–751 (calculateHourlyImpacts and calculateHourlyChangesValidation)
    Premises referenced (1)
  34. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/calculations.js, lines 92–117, 129–143, 176–241, 248–310, and 348–365
    Premises referenced (1)
  35. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/calculations.js, lines 92–117, 129–143, 176–241, 248–310, and 348–365
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/emissions.ts, lines 407–473 (calculateAggregatedEmissionsData)
    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — pp. 103–104 (PDF pp. 109–110), "Why…system fossil generation", Monte Carlo totals question, and "Can AVERT capture transmission constraints…"
    Premises referenced (2)
  36. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/components/PowerEmissionsTable.tsx, lines 16–26, 54–85, 108–134, 348–364, and 494–509
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/emissions.ts, lines 407–473 (calculateAggregatedEmissionsData)
    • NIST Handbook 44 (2026), Appendix C. General Tables of Units of Measurement (Handbook 44 – 2026, standalone official PDF of Appendix C, 28 pages) — p. C-7 (PDF p. 7), Avoirdupois Units of Mass and footnotes 10–11; p. C-9 (PDF p. 9), Section 4 (paragraphs on underlining and rounding); p. C-17 (PDF p. 17), Units of Mass Not Less Than Avoirdupois Ounces (upper table: short ton row, Avoirdupois Pounds column; lower table: pound and short ton rows, Kilograms column)

    Caveats: The numerical check does not propagate underlying statistical, parameter, or model-structure uncertainty; displayed decimals reflect tabulated calculation values rather than equivalent measurement or predictive precision.

    Premises referenced (1)
  37. Interpretation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/calculations.js, lines 92–117, 129–143, 176–241, 248–310, and 348–365
    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — p. 100 (PDF p. 106), paragraphs "How can users assess the accuracy…" and "Why do some EGUs show positive increases…"
    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — Manual, p. 98 (PDF p. 104), Table 7 (Texas row and Maximum/Minimum possible hourly load headers) (qualifies)

    Caveats: This check verifies interpolable bounds against the fixed Regional Data File's load_bin_edges rather than treating the Texas annual observed extremes in Table 7 of the User Manual as code bin edges. None of the scenarios hit out-of-range values or upper endpoints; this does not validate real-world intervention outcomes.

  38. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, rdf_TE_2023.json: region, run, regional_load[4347], regional_load[4360], and data.generation
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/impacts.ts, lines 561–656 and 665–751 (calculateHourlyImpacts and calculateHourlyChangesValidation)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/calculations.js, lines 92–117, 129–143, 176–241, 248–310, and 348–365
    Premises referenced (1)
  39. Calculation. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, server/app/calculations.js, lines 92–117, 129–143, 176–241, 248–310, and 348–365
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, client/src/calculations/emissions.ts, lines 407–473 (calculateAggregatedEmissionsData)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, annual-emission-factors.json: Texas egus under regions, joined by ORISPL/unit and annual_data.year (qualifies)
    Premises referenced (1)
  40. Synthesis. Feeding a demand change into the native model; scope bounded to named historical datasets, native models, and explicit assumptions

    • AVERT User Manual Version 4.3 (AVERT v4.3, April 2024; 149-page official PDF (desktop Main Module and Web Edition interactive features, release dates, and inputs should be verified separately)) — p. 110 (PDF p. 116), Appendix I, Web-Based AVERT (qualifies)
    • EPA AVERT Web Edition v4.3.0 (v4.3.0, tag 4ae6eeb064d48246c62d3d1e8b3640ad9d4291a5; GitHub release titled April 2024 Cloud.gov Deployment, published 2025-06-03; RDF base year 2023) — v4.3.0, rdf_TE_2023.json: region, run, regional_load[4347], regional_load[4360], and data.generation
    • About the EIA-930 data (Original HTML fragment accessed 2026-11-06 via the Hourly Electric Grid Monitor About portal, including subsequent reporting rule updates) — About the EIA-930 data: Time Reporting, Daylight Saving Time Reporting, Imputation, and Data Quality
    • Planning for the evolution of the electric grid with a long-run marginal emission rate (iScience 25(3), 103915; publicly hosted laboratory copy) — pp. 8–9 (limitations) and p. 15, Eq. (5) (PDF pp. 9–10, 16)
    Premises referenced (1)
  41. Interpretation. Moving from two separate single-hour reductions to a two-sided demand shift delivering the same service

    Premises referenced (2)
  42. Interpretation. Observed object of the ERCOT wind-potential benchmark and conditions for transferring it to load shifting

    • Validating locational marginal emissions models with wind generation (Environmental Research: Energy 1 (2024), 035008, IOP version of record, published 2024-09-04 (REsurety-hosted copy HTTP Last-Modified 2026-05-16); PDF p. 1 is a download cover sheet, and printed text pp. 1–10 correspond to PDF pp. 2–11) — End of Section 1 and Sections 2.1–2.3, Eqs. (3)–(6), pp. 2–5 (PDF pp. 3–6)
    • Validating locational marginal emissions models with wind generation (Environmental Research: Energy 1 (2024), 035008, IOP version of record, published 2024-09-04 (REsurety-hosted copy HTTP Last-Modified 2026-05-16); PDF p. 1 is a download cover sheet, and printed text pp. 1–10 correspond to PDF pp. 2–11) — Sections 3.4 and 4, Figure 4, Data availability, Acknowledgements, and Conflict of interest statement, pp. 8–9 (PDF pp. 9–10) (qualifies)

    Caveats: HSL is generally declared from short-term forecasts rather than representing manipulated customer load or physically deliverable energy at every instant. The authors are affiliated with providers of the evaluated statistical and dispatch signals, the benchmark and statistical model share CAMPD data, and node groups were formed using the dispatch signal; methodological differences do not imply independence of authors, data, or holdout samples.

  43. Interpretation. Bottom-decile grouping in the original study versus arbitrary hour-pair or magnitude inference

    • Validating locational marginal emissions models with wind generation (Environmental Research: Energy 1 (2024), 035008, IOP version of record, published 2024-09-04 (REsurety-hosted copy HTTP Last-Modified 2026-05-16); PDF p. 1 is a download cover sheet, and printed text pp. 1–10 correspond to PDF pp. 2–11) — Sections 3.1–3.3, Figures 1–3, and Table 1, pp. 5–7 (PDF pp. 6–8)
    • Validating locational marginal emissions models with wind generation (Environmental Research: Energy 1 (2024), 035008, IOP version of record, published 2024-09-04 (REsurety-hosted copy HTTP Last-Modified 2026-05-16); PDF p. 1 is a download cover sheet, and printed text pp. 1–10 correspond to PDF pp. 2–11) — Sections 3.4 and 4, Figure 4, Data availability, Acknowledgements, and Conflict of interest statement, pp. 8–9 (PDF pp. 9–10) (qualifies)

    Caveats: Error bars in Figure 2 represent 95% confidence intervals and parenthetical values in Table 1 represent standard deviations; the table caption's kgCO₂/MW and the figure axis and text unit kgCO₂/MWh are preserved as published without using Table 1 values in the finite-shift calculation below. The time-period groups are defined separately by each signal rather than sharing a single implemented dispatch window across all signals. This discussion follows the source paper's 10th-percentile threshold; without the raw time series or grouping code, tie-handling at the threshold is unverified and the low group is not assumed to contain exactly 10% of observations.

    Premises referenced (1)
  44. Interpretation. Distinct performance of named signals in low-group screening versus rate-magnitude comparison in the largest node group

    • Validating locational marginal emissions models with wind generation (Environmental Research: Energy 1 (2024), 035008, IOP version of record, published 2024-09-04 (REsurety-hosted copy HTTP Last-Modified 2026-05-16); PDF p. 1 is a download cover sheet, and printed text pp. 1–10 correspond to PDF pp. 2–11) — Sections 3.1–3.3, Figures 1–3, and Table 1, pp. 5–7 (PDF pp. 6–8)
    • Validating locational marginal emissions models with wind generation (Environmental Research: Energy 1 (2024), 035008, IOP version of record, published 2024-09-04 (REsurety-hosted copy HTTP Last-Modified 2026-05-16); PDF p. 1 is a download cover sheet, and printed text pp. 1–10 correspond to PDF pp. 2–11) — Sections 3.4 and 4, Figure 4, Data availability, Acknowledgements, and Conflict of interest statement, pp. 8–9 (PDF pp. 9–10) (qualifies)

    Caveats: This does not claim that average-signal estimates are zero across all subregions or that all confidence intervals span zero, nor does it invalidate average signals for attributional accounting.

    Premises referenced (2)
  45. Interpretation. Conditional guarantee of a selected linear dispatch basis and its non-necessity

    Caveats: This paragraph applies to a fixed selected optimal dispatch or emission-determined optimum; tied cost optima, degeneracy, and one-sided derivatives require explicit selection, because equal cost does not guarantee equal emissions. Citations rely on visible equations and published text excerpts from the journal article record; the original SecMOD model was not executed and the raw publisher PDF bytes were not archived.

  46. Interpretation. Authorial conditional derivation from single-coordinate validity ranges to two-sided demand shifts

    Caveats: This does not claim that all hours in the original paper's implementation are independent or that the paper tested complete battery charge-discharge schedules. Simultaneous shifts across multiple nodes also involve shared network constraints; the two-window example below deliberately excludes such coupling. If multiple response branches meet at the baseline, two single-direction rates may belong to different branches; observing that the joint shift is also linear does not by itself prove those rates can be summed.

    Premises referenced (2)
  47. Calculation. Author-constructed hypothetical task, equal-service premise, and two-window electricity quantities

    Caveats: All numerical parameters are author-constructed and represent neither ERCOT observations nor inputs from the German dispatch study.

    Premises referenced (1)

    Download calculation input (v1.0.0) · Download calculation results (v1.0.0)

  48. Calculation. Fixed supply capacities, merit order, and operating emission rates in the two-window example

    Caveats: Unit power is multiplied by one hour to obtain energy in this example; results cannot be extrapolated to other durations.

    Premises referenced (1)
  49. Calculation. Baseline local rates and complete shift difference before hitting the first binding capacity constraint

    Premises referenced (2)
  50. Calculation. Active-set change, exact emission difference, and failure of initial-rate extrapolation across a capacity boundary

    Premises referenced (1)
  51. Calculation. Matching emission rates across replacement units can preserve one endpoint's factor across an active-set change

    Premises referenced (2)
  52. Interpretation. Conditional synthesis across observational screening, finite dispatch-model differences, and real-world intervention evidence

    Premises referenced (6)
  53. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

  54. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

  55. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

  56. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

  57. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

  58. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  59. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  60. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (1)
  61. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    • Cambium 2024 Data, GEA annual metrics, historical intensity and mappings (2024 data release; public Scenario Viewer project 5c7bef16-7e38-4094-92ce-8b03dfa93380, file IDs 69141, 69180, and 69181) — Cambium24_allScenarios_annual_gea.csv, rows 4–6 and row 13 (MidCase/ERCOT/2025), fields distloss, aer, srmer, lrmer, and total_gen
    • Cambium 2024 Scenario Descriptions and Documentation (2024 data edition, 5th release; NREL/TP-6A40-93005, title page dated April 2025; 77-page NREL PDF) — pp. 21, 25–29, 34 (PDF pp. 28, 32–36, 41), Section 5.1 (equation and footnote 13), Section 5.3 (behind-the-meter PV equivalent), Section 5.4, and Section 5.7
    • Cambium 2024 Scenario Descriptions and Documentation (2024 data edition, 5th release; NREL/TP-6A40-93005, title page dated April 2025; 77-page NREL PDF) — pp. 17–20, 22–24 (PDF pp. 24–27, 29–31), Sections 4.1–4.2, Figures 4–5, and Section 5.2
  62. Interpretation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

  63. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    • Workbooks for Cambium 2024 Data (Internally dated Released March 2025; catalog v1 dated 2025-04-10; catalog Last Updated 2026-03-12) — Data - Annual!B7, P7, BL7, DH7, FD7, GZ7, IV7 and rows 3–5 of each column; GWP!B7:E7
    • Cambium 2024 Scenario Descriptions and Documentation (2024 data edition, 5th release; NREL/TP-6A40-93005, title page dated April 2025; 77-page NREL PDF) — pp. 26–29, 39–41 (PDF pp. 33–36, 46–48), Sections 5.4 and 6.2, and Table 5
    Premises referenced (1)
  64. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    • Workbooks for Cambium 2024 Data (Internally dated Released March 2025; catalog v1 dated 2025-04-10; catalog Last Updated 2026-03-12) — Data - Annual!B7, P7, BL7, DH7, FD7, GZ7, IV7 and rows 3–5 of each column; GWP!B7:E7
    • Cambium 2024 Data, GEA annual metrics, historical intensity and mappings (2024 data release; public Scenario Viewer project 5c7bef16-7e38-4094-92ce-8b03dfa93380, file IDs 69141, 69180, and 69181) — Cambium24_allScenarios_annual_gea.csv, rows 4–6 and row 13 (MidCase/ERCOT/2025), fields distloss, aer, srmer, lrmer, and total_gen
    • Cambium 2024 Scenario Descriptions and Documentation (2024 data edition, 5th release; NREL/TP-6A40-93005, title page dated April 2025; 77-page NREL PDF) — pp. 26–29, 39–41 (PDF pp. 33–36, 46–48), Sections 5.4 and 6.2, and Table 5
    • Workbooks for Cambium 2024 Data (Internally dated Released March 2025; catalog v1 dated 2025-04-10; catalog Last Updated 2026-03-12) — Description and Guidance!B16 (scope notes for Combustion, Precombustion, and Combined) (qualifies)

    Caveats: The numerical check does not propagate underlying statistical, parameter, or model-structure uncertainty; displayed decimals reflect tabulated calculation values rather than equivalent measurement or predictive precision.

    Premises referenced (1)
  65. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  66. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  67. Calculation. Which assets future demand changes can alter; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  68. Synthesis. Connecting electricity responses back to life cycle questions; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  69. Calculation. Evaluates how attributional average vs. consequential marginal grid intensities shift the paired climate difference and tolerance verdict in the wall-service teaching extension.

    Caveats: The 0.30, 0.65, and 0.08 kg CO₂/kWh electricity intensities are author-invented pedagogical assumptions illustrating grid-modeling sensitivity, not empirical power-system measurements.

    Premises referenced (3)

    Download calculation input (v1.0.0)

  70. Synthesis. Connecting electricity responses back to life cycle questions; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (2)
  71. Synthesis. Connecting electricity responses back to life cycle questions; scope bounded to named historical datasets, native models, and explicit assumptions

    Premises referenced (4)