Contents · Part III · Sharing Burdens, Shifting Supply · Full Text & Print
Chapter 11 Market Response
Comparing Swiss electricity accounts with two hypothetical power-supply scenarios to distinguish where purchased electricity comes from and which generator actually increases output when demand grows.
11.1 Responding Activities
The joint-production case stipulated that separate supply withdrew by a specified quantity, permitting one route to be subtracted from another. In reality, whether such withdrawal occurs must be verified. If demand for a material falls, who cuts production? If output expands, which regional power grid generates more electricity? The average origin of electricity already consumed, the supplier named on a contract, and the process that actually increases or decreases output each require different evidence. This chapter examines how to identify which activities respond and under what conditions those different answers converge.[1]
Weidema, Frees, and Nielsen (1999) define a marginal production technology as one whose activity level changes in response to a small change in demand. While comparing the resulting increases or decreases, their framework holds the rest of society's production constant; interventions large enough to reshape the wider background economy require separate scenarios. Here "marginal" specifies which change is being estimated—whether a technology is modern, high-emitting, or newly built must be determined separately for the affected activity.[2]
Determining how supply responds starts with asking what can adjust over the relevant time horizon. Firms can alter utilization of existing equipment, or they can build, replace, or retire capital equipment. Weidema, Frees, and Nielsen (1999) define the long term by whether capital equipment adjusts rather than by a universal number of years across industries. They argue that most life cycle assessment (LCA) decisions affect investment, while noting exceptions such as internal adjustments without commercial exchange, sectors without investment plans, or capacity governed outside market mechanisms. Uncoordinated replacement schedules across firms can also cause aggregate capacity to adjust continuously. Whether long-term capacity adjustment applies depends on the specific decision and on current and expected market trends.[3]
The 1999 five-step procedure first establishes the time horizon and then tests whether the change propagates through a market. If evidence shows that the change falls exclusively on a specific process without passing through a market to other producers, the procedure stops and identifies that process as the responding activity. If the change propagates through a market, the analyst sequentially examines the market trend, which technologies are constrained from adjusting, and which unconstrained technology is most likely to respond. The paper's complete decision tree is built for long-term capacity adjustments; analyzing short-term operational dispatch requires separate evidence.[4]
Naming a supplier on a contract does not settle whether that supplier adjusts its own output. Weidema, Frees, and Nielsen (1999) note that close cooperation, shared ownership, or even a sole-supplier relationship can still transmit demand changes to other firms. On-site self-generation qualifies as a directly affected process only when its output varies with internal demand without altering generation in the general market. Moving from a purchase certificate to an actual change in generation requires a verifiable transmission mechanism.[5]
Falling demand does not automatically trigger immediate capacity retirement. If demand declines more slowly than equipment naturally wears out, new capacity additions may still be needed; early retirement becomes the likely adjustment only when demand falls faster than the normal replacement rate. Near that boundary, delayed retirement can alter the outcome, so the authors advise retaining both scenarios. Next, the analyst checks which technologies are constrained by resources, product quality, policy, emission caps, or co-product outlets, and examines how investors or plant operators weigh cost and flexibility—engineering cost alone is only one factor.[6]
The 1999 paper illustrates this reasoning using contemporary European long-term baseload electricity supply. Whether coal-fired power responds depends on market liberalization, transmission capacity, and whether emission targets constrain hard coal; altering emission constraints shifts the Nordic conclusion as well. Hydropower, nuclear power, wind power, and combined heat and power (CHP) each face distinct resource, policy, technical, and heat-market constraints. The example demonstrates how boundary conditions change the inferred supplier; identifying incremental generation in any current region requires checking that region's actual conditions.[7]
The same paper also illustrates when average and responding technologies can converge. In its pulp and paper example, transport distances, raw-material availability, and expansion potential at existing mills make the supply response vary by region. Where existing mills within a region use relatively uniform technology, the inferred marginal technology can closely resemble the regional average technology. Convergence is possible under specific conditions, but its extent must still be explained through regional mechanisms.[8]
11.2 Market Boundaries
The 1999 critique shifted attention first to where aluminum comes from. Eirik Nordheim of the European Aluminium Association argued that aluminum is a global commodity whose small demand increments can be met simultaneously by expanding existing smelters, reactivating idle capacity, and building new plants rather than by a single new smelter. Hydropower sites may lie far from load centers, constrained by transmission limits. Even when a buyer specifies a particular supplier, the delivered metal may originate from varied regions or recycled streams. Any method must therefore clarify how aluminum delivery links to specific production activities and their electricity supply.[9]
Nordheim accordingly recommended aggregating data across all potential delivery sources when assessing future supply of a global commodity, citing a stable hydropower share in industry statistics to oppose designating a single power source. Strictly speaking, those statistics show that hydropower's share remained similar over the comparison period. Establishing what would have happened without the extra demand still requires a counterfactual, and attributing an increment to specific sources still requires supply-response evidence. The geographic-boundary critique Nordheim raised and the evidentiary reach of his cited statistics must be evaluated separately.[10]
In his reply, Weidema (1999) argued that although a single small change may not alter capital stock in the short run, many small increments accumulate to require new capacity. At the same time, he conceded that the original five-step procedure had not specified geographic market boundaries and accepted that affected aluminum production should be identified on the global commodity market rather than the European market assumed in the packaging study under discussion. Once the commodity market is bounded, electricity markets must still be delineated separately: the commodity market may be global, whereas electricity markets remain constrained by regional grid connections.[11]
When aluminum smelting capacity adjusts across several regions at once, power generation may respond separately in each region. The 1999 paper treated much aluminum-sector hydropower as already fully utilized and therefore constrained, while preserving local exceptions lacking immediate alternative electricity users. Weidema's reply further linked low-cost power sources to new smelter siting: in some cases existing hydropower is diverted from other users, whereas in others new smelters accompany the development of previously untapped power resources. Distinguishing the two mechanisms requires specifying location, grid connectivity, and time horizon.[12]
Weidema's reply also cited an unpublished industry compilation of announced new smelter projects and their planned power sources to show that tracing market responses could still yield a high hydropower share. Because that compilation remained unpublished, whether announced projects materialized requires tracking, and project announcements alone cannot isolate the effect of a particular demand change. The reply shows how Weidema answered the critique, but it does not empirically verify the actual global electricity response of aluminum production.[13]
When Ekvall and Weidema (2004) synthesized system boundaries and input data for consequential life cycle inventory analysis, they explicitly traced the five-step identification procedure back to the 1999 paper. That citation lineage is verifiable directly in the text. Because the 2004 article cites neither Nordheim's comment nor Weidema's reply, sequential publication and overlapping authorship cannot by themselves establish that all points from the 1999 debate were resolved.[14]
Ekvall and Weidema (2004) operationalize the task by identifying the competing market first. Obligatory product properties, geographic boundaries, customer segments, and temporal segments determine which suppliers actually compete; even within the same power grid, peak-load and off-peak periods may require separate analyses. Only within the relevant market segment does the analyst evaluate capacity, utilization, trends, and constraints. Because the resulting response may involve multiple technologies acting together, defining the competitive scope must precede modeling how individual activities change.[15]
Ekvall and Weidema (2004) use Nordic aluminum smelting to illustrate constrained hydropower. If total hydropower generation does not expand with demand, additional hydropower consumed by a smelter must be diverted from other electricity users. If those other users maintain their electricity consumption, replacement generation must fill the gap. Constant hydropower generation is what allows hydropower to cancel out of the net change, and unchanged demand among other users is what requires replacement generation. Knowing that installed capacity is fixed does not by itself prove that generation is fixed; short-term dispatch and long-term capacity expansion must still be distinguished.[16]
11.3 Average Mixes
Even asking only where electricity already consumed in a region originated requires explicit rules for imports, exports, and transit flows. Weidema's 1999 reply cites the Paul Scherrer Institute (PSI) report by Ménard, Dones, and Gantner (1998), which weights supply sources by electricity volume to derive average consumption mixes. Whereas the pulp example examined whether technologies within a region are similar, a consumption mix reports average historical origins; determining which generator increases output for one extra unit of demand remains a separate question.[17]
The PSI report begins by placing all flows in a common electricity unit: domestic generation P, imports I, exports E (recorded as a positive quantity), and domestic consumption plus network losses V. Vectors mP, mI, mE, and mV record the source shares of each flow under a consistent classification, giving the balance equation P × mP + I × mI = V × mV + E × mE. Total electricity volumes balance first, but assigning source shares still requires an accounting rule: can imported electricity be re-exported, and do exports carry the domestic generation mix or a pooled mix? Different rules produce different consumption mixes from the exact same cross-border electricity flows.[18]
PSI defines four accounting models, M1 through M4. Model M2 blends domestic generation and imports into a single pool from which both domestic consumption and exports draw; because imports themselves carry foreign mixes, trade loops and indirect trade can require solving simultaneous equations. Model M3 deducts exports from domestic generation and assigns imports to domestic consumption, ruling out simultaneous transit or stripping out known transit flows first. Physical power flows, contractual claims, and accounting allocations each require different evidence; here only the accounting allocation rule changes.[19]
Applying M3 to the report's 1995 Swiss data illustrates the denominator discipline required. Domestic generation of 60,277 gigawatt-hours (GWh) plus imports of 18,113 GWh minus exports of 25,143 GWh equals 53,247 GWh. Table A.1 of the report lists final consumption (51,567 GWh) and network losses (1,680 GWh) separately, while the main-text definition of V includes both in the denominator. Dividing loss-inclusive source volumes by final consumption of 51,567 GWh alone would break the requirement that shares sum to one. Reporting a mix at the final-user meter requires specifying how losses are allocated and where electricity is delivered; the calculation below retains the loss-inclusive denominator V.[20]
First deduct exports from domestic generation: under M3, Swiss generation retained domestically is 60,277 − 25,143 = 35,134 GWh. Adding imports from Germany (7,014 GWh), France (9,116 GWh), Austria (1,973 GWh), and Italy (10 GWh) sums exactly to 53,247 GWh. Dividing each entry by this denominator yields source shares of approximately 65.9831%, 13.1726%, 17.1202%, 3.7054%, and 0.0188%, respectively. These percentages reproduce the exact relationship between the report's integer electricity tables and the M3 rule; they do not imply that incremental electricity demand would be met in those five proportions.[21]
Once source shares are established, each origin must be paired with its corresponding emission inventory. PSI draws on existing energy-system inventories to compute carbon dioxide (CO₂) and other flows. Converting those totals into emissions per kilowatt-hour requires checking system boundaries, voltage levels, and network losses; likewise, CO₂ mass cannot be extended directly to CO₂-equivalent across all greenhouse gases. Whenever electricity results diverge sharply, analysts must inspect the mix rule, denominator, and emission factors before attributing the gap to underlying generation technologies.[22]
The PSI authors acknowledge that rigorously estimating a demand change calls for modeling supply responses. Because future market and policy scenarios are uncertain, however, they recommend reporting an average consumption mix first—to preserve consistency and comparability—and testing sensitivity with marginal scenarios. In their example, Swiss purchases of French nuclear power might induce additional generation in Italy, yet they attribute that induced burden to Italian electricity users. Footnote 14 records reviewer Frischknecht's dissent: decision-oriented studies should use the marginal mix directly. Both sides address demand-induced supply changes; they divide over which mix should serve as the primary reported baseline.[23]
11.4 Conditional Supply
Now hold an incremental material service constant and compare two hypothetical electricity responses. Under fixed location, period, and grade specifications, an additional 1 kg of material demand is met by a selected plant increasing output by exactly 1 kg, consuming a fixed 10 kilowatt-hours (kWh) per kg. This link from demand to output at that specific plant is stipulated here rather than inferred from plant location or purchase certificates. Both response scenarios deliver the same extra 1 kg of material while all other grid users continue consuming 100 kWh; the baseline excludes the extra 1 kg. Rather than comparing two equal-service substitutes, the baseline and each intervention are used to isolate the net change caused by the same added service.[24]
Fix the electricity subsystem cleanly. Suppose generators H and G supply interchangeable electricity within this market, with no transmission constraints, imports, exports, or network losses; non-electricity inputs, co-products, and demand feedback are omitted. H and G are abstract hypothetical sources rather than empirical hydropower or fossil-fuel factors, with linear CO₂ inventories of 0.02 kg/kWh and 0.8 kg/kWh, respectively. Both scenarios share identical factors and boundaries, varying only which generator actually responds: in Scenario 1, total output of H is capped and G expands; in Scenario 2, H expands while G remains unchanged. Both are static before-and-after comparisons over an abstract period without distinguishing dispatch from capacity expansion. The result measures CO₂ changes within this bounded power subsystem—not a full material footprint, climate impact score, or real-market forecast.[25]
Start from the baseline without incremental material production. Other users draw 40 kWh from H and 60 kWh from G, totaling 100 kWh, while the selected plant has zero incremental electricity use. Applying the stipulated factors gives baseline CO₂ emissions of 40 × 0.02 + 60 × 0.8 = 48.8 kg. In each scenario below, all positive generation activities are listed in full before subtracting this baseline, separating electricity assigned to the buyer from generation actually added across the system.[26]
Now supply the plant's 10 kWh under Scenario 1, where total output of H is locked at 40 kWh. Once the plant claims 10 kWh of H, other users receive only 30 kWh of H and must draw 70 kWh from G to maintain their 100 kWh service. Post-intervention system generation is therefore 40 kWh of H plus 70 kWh of G, totaling 110 kWh, with CO₂ emissions of 40 × 0.02 + 70 × 0.8 = 56.8 kg. Relative to the baseline, H does not change, G rises by 10 kWh, and CO₂ rises by 8 kg. No negative power plant appears: H delivered to other users falls, while positive generation expands at G.[27]
Next allow H to expand under Scenario 2. Here H increases output by 10 kWh to supply the plant while G stays at 60 kWh. Other users continue drawing 40 kWh of H and 60 kWh of G, and the plant adds 10 kWh of H, bringing total system generation to 50 kWh of H plus 60 kWh of G (110 kWh) and CO₂ emissions to 50 × 0.02 + 60 × 0.8 = 49 kg—an increase of 0.2 kg over the baseline. The added material service, total electricity service, and emission factors are identical to Scenario 1; only which source expands has changed, yet that single condition creates a 7.8 kg difference in net emissions.[28]
Return to the plant's electricity purchase record. Multiplying its purchased 10 kWh of H by H's factor of 0.02 kg/kWh yields 0.2 kg in both scenarios. That product answers an attribution question for the contracted electricity; it matches the system-wide net increase in Scenario 2 (0.2 kg) but diverges sharply from Scenario 1 (8 kg), where claiming H never caused H to generate more electricity. Whether contractual attribution equals the system change depends on physical supply response, not on whether the same generator name appears on the certificate.[29]
Applying this logic to a globally traded material begins by identifying which plants adjust output. Let the output change in region r be Δqᵣ (in kg) and its electricity intensity be eᵣ (in kWh/kg). Once linearity and efficiency premises are verified, multiplying Δqᵣ by eᵣ gives the regional change in electricity demand. Each region's power-generation response must then be evaluated according to local time periods, grid connections, and capacity constraints before summing the resulting inventories. The material market provides evidence of producer adjustments, while regional electricity markets provide evidence of generation adjustments; neither identification step can be skipped.[30]
Deciding between competing response hypotheses calls for targeted empirical checks: whether the plant actually expanded output or merely switched delivery channels, whether H increased total generation, how other users met their electricity demand, and whether inter-regional transmission limits bound the grid. Analysts must also distinguish short-term dispatch, reactivation of idle capacity, new construction, and capacity retirement over the study period. Contracts, generation statistics, plant records, and policy documents each support one link in this chain rather than constituting an observed end-to-end market response on their own.[31]
Because observing every capacity, trade, and dispatch response in real markets typically exceeds the reach of a single study, major international handbooks, standards, and background databases each codify operational modeling boundaries. Whether examining the International Reference Life Cycle Data System (ILCD) 2010 Handbook, the ecoinvent v3 background system models, the European Union (EU) Product Environmental Footprint (PEF), or the Greenhouse Gas (GHG) Protocol Product Standard, all four confront the same four structural questions introduced above: (1) how large is the supported decision, and does it cross a threshold that alters background capacity additions or retirements; (2) which supply activities are constrained by resources, policy, or joint production from expanding freely; (3) should purchased electricity or bulk materials be accounted for via physical trade balances, contractual tracking with residual mixes, or long-term unconstrained marginal mixes; and (4) should co-products and recycling flows triggered by demand changes be resolved through substitution credits, attributional allocation, or fixed formulas?[32]
Across those four questions, the frameworks share three conditional points of convergence. First, all recognize that inventory modeling must serve the study's goal rather than declaring attributional or consequential modeling universally superior: just as Ekvall, Tillman, and Molander (2005) link retrospective and prospective approaches to distinct normative ethics, the ecoinvent v3 guideline recommends consequential modeling for decisions while explicitly reserving attributional models for societal hot-spot screening, fair environmental-tax allocation, and retroactive responsibility or reward. Second, all enforce double-counting prevention in electricity and supply mixes: both PSI's import–export balance and EU PEF's removal of claimed green power to form national residual consumption mixes reject crediting the same low-carbon attribute to both a contractual buyer and the public grid. Third, every framework that permits substitution places the burden of proof on the party claiming the credit: substitution is never subtracting a nominal inventory at will, but requires showing that the displaced supply exists, the market can absorb it, and applicable conditions are met.[33]
Sharp divergence begins with decision-context classification and scale thresholds. ILCD (2010) classifies studies by decision-support role and whether changes induce large-scale structural shifts: Situation A (micro-level decision support) assumes changes stay below capacity thresholds and uses existing supply chains and average consumption mixes as a pragmatic simplification; only when added demand or supply exceeds the normal annual capacity-replacement rate of an affected process—triggering new builds or early retirements—does Situation B (meso/macro-level decision support) apply long-term marginal mixes to "large-change" processes alongside 90% error-range plausible worst- and best-case scenarios. Pure accounting (C1/C2) may not support procurement or policy comparisons, and footnote 15 clarifies that past versus future is not the dividing axis between attributional and consequential modeling. The ecoinvent v3 consequential model directly challenges ILCD's micro-scale simplification: Weidema et al. (2013) argue that individual purchases cumulatively drive investment, adopt a default 30-year capital lifetime (3.33%/year replacement rate) to distinguish old from modern/new marginal suppliers, and represent absolute constraints via conditional exchanges without empirical elasticities. EU PEF and the GHG Protocol Product Standard, by contrast, lock product inventories to attributional boundaries, leaving market-response consequential analysis to policy or mitigation-project evaluations.[34]
The same divide is starkly visible in electricity-mix accounting rules. The Paul Scherrer Institute (PSI) models (M1–M4) build physical trade balances from customs and generation statistics without relying on contractual certificates; even though the four rules yield different average origins from the same 1995 Swiss data, the PSI authors advocate reporting average mixes first with marginal sensitivity checks, whereas Frischknecht (footnote 14) insists decision-oriented studies use marginal mixes directly. EU PEF (Annex I §4.4.2) takes a strict attributional contractual-tracking route, stepping down a four-tier hierarchy: supplier-specific electricity products meeting tracking criteria, supplier total mixes, country residual consumption mixes (with mandatory fallback when untracked shares exceed 95%), and regional residual mixes, while applying consumption grid mixes in the use phase. By contrast, ecoinvent v3's consequential model excludes constrained sources—such as hydropower, waste incineration, and CHP co-product electricity—from marginal supply and weights unconstrained technologies by their positive capacity growth between scenario years. As Treyer and Bauer (2016) and Vandepaer et al. (2019) emphasize, that algorithm models long-term capacity expansion rather than hourly dispatch, and normalizing solely by positive growth breaks down in shrinking markets that respond through delayed retirement.[35]
How a framework diagnoses market constraints also governs its treatment of co-products and recycling flows. In ecoinvent v3's consequential model, joint production retains in principle a single determining reference product; constrained by-products are always substituted by unconstrained marginal routes, or converted into reduced consumption by other users through conditional exchanges when a market is constrained. ILCD Situation A permits substitution with an average market mix when subdivision is infeasible and market-absorption conditions hold, falling back to two-step allocation otherwise; Situation C2 allocates uniformly. EU PEF (Annex I §4.5) raises the bar further, demanding dual proof of a direct market effect and a directly representative inventory before permitting direct substitution, and replaces open-ended consequential modeling at end-of-life with the Circular Footprint Formula—whose fixed parameters A (0.2, 0.5, or 0.8) and default B (0) are policy conventions rather than dynamic elasticities. The GHG Protocol Product Standard (§9.3.2) confines system expansion to an attributional frame: credits are allowed only when a company knows the by-product's fate and applies supplier-specific or average factors (for example, crediting 50 kg for black-liquor electricity against a local grid reduces 1,000 kg to a net 950 kg), while §11.3.2 prohibits deducting market-mediated "avoided emissions" from inventory totals and requires any separate disclosure to report indirect emission increases alongside.[36]
These framework differences are not mere semantic disputes; they can invert option rankings under identical physical facts and purchase contracts. Return to the hypothetical case: given the exact same 10 kWh purchase contract and a fixed total cap on low-carbon source H, EU PEF contractual tracking or GHG Protocol supplier attribution records 0.2 kg of CO₂ for the plant, whereas Weidema and ecoinvent v3 constrained-market logic traces the diverted supply to 10 kWh of extra high-carbon G generation, lifting the net system increase to 8 kg of CO₂—a 40-fold gap (net difference of 7.8 kg). Similarly, in the Swedish Thorskog Castle hotel case (Ekvall et al. 2005), hydropower appears low-carbon under local attribution yet can correspond to fossil-fuel expansion under marginal consequences; likewise, Switzerland's 1995 M3 mix (65.9831% domestic retention and roughly 34.02% imports from four neighbors) cannot be extrapolated as the response share of incremental demand. Whenever an alternative relies on green certificates or hydropower contracts tied to constrained low-carbon generation, switching frameworks can reverse the ranking of electricity-intensive processes; conversely, applying long-term marginal factors to short-term dispatch or shrinking markets can misstate mitigation effects in the opposite direction. Silently mixing system boundaries within a single comparison is therefore untenable.[37]
Table: Decision Contexts, Supply-Mix Rules, and Blind Spots Across Five Market-Response and Electricity-Accounting Frameworks
| Framework and Core Literature | Decision Context and Scale Criterion | Market Boundary and Electricity / Supply-Mix Rules | Co-Product and Substitution Treatment | Key Blind Spots and Applicability Limits |
|---|---|---|---|---|
| ILCD 2010 Handbook (European Commission Joint Research Centre, 2010) | Classifies Situation A (micro), B (meso/macro), and C1/C2 (accounting) by decision-support role and whether changes exceed normal annual capacity replacement; time is not the dividing axis | Situation A retains existing capacity and average consumption mixes; Situation B applies long-term marginal mixes only to "large-change" processes with 90% plausible worst/best scenarios | Situation A substitutes with average mixes when market absorption and other conditions hold, otherwise two-step allocation; C2 always allocates; C1/C2 cannot directly support comparative decisions | Lacks a cross-industry empirical threshold between A and B; micro-scale average simplification omits cumulative effects of small increments |
| ecoinvent v3 Consequential Model (Weidema et al. 2013; Treyer & Bauer 2016; Vandepaer et al. 2019) | Targets small-scale long-term decisions; argues individual purchases cumulatively drive capital investment and rejects micro-scale average simplification | Excludes constrained power sources and by-products; default 30-year lifetime (3.33%/year replacement rate): annual decline > 3.33% links to old technologies, otherwise modern/new technologies | By-products are always constrained and substituted via unconstrained marginal routes; constrained markets use conditional exchanges to model reduced consumption | Models absolute constraints rather than empirical elasticities; unsuitable for short-term hourly dispatch, and positive-growth normalization fails in shrinking markets |
| EU PEF (Commission Recommendation (EU) 2021/2279, OJ L 471; corrigendum OJ L 144) | Locks product inventories into an attributional accounting framework to preserve cross-company comparability and audit consistency | Section 4.4.2 four-tier contractual hierarchy: qualifying supplier-specific product → supplier total mix → country residual consumption mix (mandatory fallback when untracked > 95%) → regional residual mix; consumption mix in use phase | Section 4.5 requires dual proof (direct market effect and directly representative inventory) for direct substitution; end-of-life uses the Circular Footprint Formula with fixed parameters A and B | Prevents attributional double counting, but does not verify whether green certificates trigger additional physical capacity; parameter A is a fixed convention rather than dynamic elasticity |
| GHG Protocol Product Standard (World Resources Institute [WRI] / World Business Council for Sustainable Development [WBCSD], 2011) | Mandates attributional accounting (Section 5.2); Box 5.1 assigns consequential paths to mitigation projects and public policy | Links attributional processes to supplier-specific or average emission factors; covers greenhouse gases only and does not support public comparative assertions under International Organization for Standardization (ISO) 14044 | Section 9.3.2 permits attributional system expansion only when by-product fate is known and average factors are used (black liquor example: 1,000 − 50 = 950 kg); Section 11.3.2 forbids subtracting market avoided emissions | Separate disclosure of avoided emissions must report indirect emission increases alongside (e.g., indirect land-use change); does not answer net system consequences of cross-product market substitution |
| PSI 1998 Electricity Accounts and Dissent (Ménard et al. 1998; Frischknecht footnote 14) | Explicit methodological divide between consistent comparability and decision-oriented marginal response | M1–M4 rest on physical generation and customs trade balances (M3 Swiss domestic retention = 65.9831%); PSI recommends average mix first plus marginal sensitivity, while Frischknecht favors marginal mixes directly for decisions | Attributes increased Italian generation triggered by Swiss use of French nuclear power to Italian users, illustrating the split between attributional and physical causal boundaries | Covers historical annual electricity statistics only; excludes contractual certificate tracking systems and does not empirically verify cross-border dispatch causal chains |
Comparing all five frameworks leaves three unresolved empirical and governance unknowns that must be stated candidly. First, broad ex-post empirical validation of whether real markets absorb an increment of demand through short-term dispatch, idle-capacity reactivation, delayed retirement, new investment, or price-induced demand reduction remains scarce; theoretical flowcharts and full-elasticity assumptions must not be mistaken for observed facts. Second, ILCD lacks a cross-industry empirical threshold separating Situations A and B, while ecoinvent v3 replaces industry-specific dynamics with a uniform 30-year / 3.33% default, omits empirical elasticities, and has exhibited version-specific implementation errors and high sensitivity to scenario windows (Vandepaer et al. 2019 documented hard-coal omissions, hydropower mapping issues, and concentrating solar power double-counting in v3.4, with an average correction under 3%, subsequently fixed in v3.5). Third, underlying datasets for several historical capacity compilations cited in this chapter were not retrieved, and certain later reviews lie outside open verification scope. Until empirical evidence closes these gaps, cross-framework findings should be presented alongside their governing premises, constraint assumptions, and sensitivity ranges rather than treating any single compliant calculation as the sole truth of market response.[38]
Returning to the chapter's starting point, the Swiss electricity accounts show that average supply origins can be audited once import–export allocation rules are fixed, whereas the two incremental-demand scenarios and cross-framework comparison show that identical electricity purchases can still trigger generation from different power plants—and that scale thresholds, contractual tracking, and physical constraint assumptions can flip option rankings. Interpreting a subtracted credit in joint production as a real-world consequence requires specifying the action taken and the service delivered, then investigating market boundaries, supply constraints, and which activities actually adjust. Building on this foundation, the next chapter, Electricity Systems, examines where electricity is delivered, where it is generated, and how supply models estimate the consequences of demand changes.[39]
Notes
Synthesis. Transition from stipulated supply responses in joint production to empirical identification of responding activities
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Box 2 and Section 2(b) (direct supply, hydropower, and green electricity paragraphs), print pp. 49–51; PDF pp. 2–4
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 6 (Identification of the Competing Product), print p. 168; PDF p. 8
Premises referenced (2)
Interpretation. Definition of marginal production technology under small demand perturbations in Weidema, Frees, and Nielsen (1999)
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Box 1 and Section 1 (Introduction), print pp. 48–49; PDF pp. 1–2
Source statement. Capacity utilization, capital adjustment, and long-term relevance in Weidema, Frees, and Nielsen (1999, §2(a))
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Section 2(a) and Figure 1, footnote (*), print pp. 49–50; PDF pp. 2–3
Interpretation. Sequence, stopping condition, and long-term scope of the 1999 five-step identification procedure
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Sections 2(a)–(e), Figure 1, and footnote (**), print pp. 49–52; PDF pp. 2–5
Interpretation. Conditional distinction between a named contractual supplier and an actually responding process
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Box 2 and Section 2(b) (direct supply, hydropower, and green electricity paragraphs), print pp. 49–51; PDF pp. 2–4
Interpretation. Role of capital replacement rates, constraints, and investor preferences in the 1999 procedure
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Sections 2(d)–(e), Sections 3(d)–(e), and Table 1, print pp. 51–54; PDF pp. 4–7
Interpretation. Historical fuel and constraint conditions in the 1999 European long-term baseload illustration
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Sections 2(d)–(e), Sections 3(d)–(e), and Table 1, print pp. 51–54; PDF pp. 4–7
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Sections 5–6, print p. 55; PDF p. 8
Interpretation. Conditions for convergence between regional average and marginal technologies in the 1999 pulp and paper example
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Section 4 (Another Example: Pulp and Paper), print pp. 54–55; PDF pp. 7–8
Interpretation. Nordheim's 1999 critique regarding global aluminum supply, capacity adjustments, and transmission limits
- Comment: Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(6):308 (1999); p. 1 of the combined Comment/Reply PDF) — Comment (Introduction, Factual Situation, and Conclusion), print p. 308; PDF p. 1
Interpretation. Nordheim's average-source recommendation and the inferential limits of its supporting statistics
- Comment: Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(6):308 (1999); p. 1 of the combined Comment/Reply PDF) — Comment (Introduction, Factual Situation, and Conclusion), print p. 308; PDF p. 1
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Box 1 and Section 1 (Introduction), print pp. 48–49; PDF pp. 1–2 (qualifies)
Caveats: The original International Primary Aluminium Institute (IPAI) statistics cited in the comment were not independently verified here; figures reported in the comment do not constitute a reconstructed industry sample.
Source statement. Weidema's 1999 reply on cumulative increments and his concession on geographic market boundaries
- A Reply to the Aluminium Industry: Each Market Has Its Own Marginal (IJLCA 4(6):309–310 (1999); pp. 2–3 of the same 3-page PDF (upper half of p. 310 only)) — Reply, opening to upper half of left column (small increments, aluminum market, and original five-step procedure), print p. 309; PDF p. 2
Interpretation. Conditional link between a global aluminum market and multiple regional electricity responses
- A Reply to the Aluminium Industry: Each Market Has Its Own Marginal (IJLCA 4(6):309–310 (1999); pp. 2–3 of the same 3-page PDF (upper half of p. 310 only)) — Reply, both columns (regional grids and multiple marginals), print p. 309; PDF p. 2
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Box 2 and Section 2(b) (direct supply, hydropower, and green electricity paragraphs), print pp. 49–51; PDF pp. 2–4
Interpretation. Evidentiary limits of the unpublished industry capacity projections cited in Weidema's 1999 reply
- A Reply to the Aluminium Industry: Each Market Has Its Own Marginal (IJLCA 4(6):309–310 (1999); pp. 2–3 of the same 3-page PDF (upper half of p. 310 only)) — Reply, right column (new-plant forecast paragraph) and References, print pp. 309–310; PDF pp. 2–3
Caveats: The unpublished Aluminium Association (1999) compilation was not retrieved; its sample, weights, project deduplication, and realization rates cannot be reconstructed.
Interpretation. Documented citation lineage from 1999 to Ekvall and Weidema (2004) versus unverified resolution of the 1999 debate
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 1.1, Section 7, and References, print pp. 161, 169, 171; PDF pp. 1, 9, 11
Interpretation. Obligatory properties and market segmentation preceding marginal technology identification in Ekvall and Weidema (2004)
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 6 (Identification of the Competing Product), print p. 168; PDF p. 8
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 7(a)–(e) with continuation on p. 170, and Section 5 (feedback paragraph), print pp. 168–170; PDF pp. 8–10
Interpretation. Diversion and replacement-generation mechanism under constrained hydropower with fixed demand from other users
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 4 (resource/capacity constraints), hydropower paragraph on p. 167, and Figures 8–9, print pp. 166–168; PDF pp. 6–8
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 7(a)–(e) with continuation on p. 170, and Section 5 (feedback paragraph), print pp. 168–170; PDF pp. 8–10
Interpretation. Distinguishing PSI average consumption mixes from regional technology homogeneity and marginal demand response
- A Reply to the Aluminium Industry: Each Market Has Its Own Marginal (IJLCA 4(6):309–310 (1999); pp. 2–3 of the same 3-page PDF (upper half of p. 310 only)) — Reply, final paragraph (Danish/Nordic boundary and PSI Swiss example), print pp. 309–310; PDF pp. 2–3
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Section 3.2 (import/export definitions and balance equations), T1, and Table A.1, print pp. 8–12, 88; PDF pp. 19–23, 93
Premises referenced (1)
Interpretation. Electricity balance equation with consistent source shares and loss-inclusive domestic consumption V in PSI (1998)
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Section 3.2 (import/export definitions and balance equations), T1, and Table A.1, print pp. 8–12, 88; PDF pp. 19–23, 93
Interpretation. Contrasting attribution rules between PSI pooled model M2 and domestic-net-of-exports model M3
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Definitions of M1–M4, T1, and T3–T5, print pp. 9–12, 18–19; PDF pp. 20–23, 29–30
Calculation. Loss-inclusive denominator V versus final consumption in the 1995 Swiss M3 calculation
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — M3 formula in T1, Table A.1 (Switzerland 1995 row), and Table A.3 (Switzerland column), print pp. 12, 88, 90; PDF pp. 23, 93, 95
Premises referenced (2)
Calculation. Recomputed source shares from integer electricity volumes under the PSI M3 rule for Switzerland (1995)
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — M3 formula in T1, Table A.1 (Switzerland 1995 row), and Table A.3 (Switzerland column), print pp. 12, 88, 90; PDF pp. 23, 93, 95
Premises referenced (1)
Interpretation. Coupling source shares with underlying inventories, voltage levels, and network-loss delivery boundaries
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Section 3.2.5, T5, and Section 5.1 (voltage and grid losses), print pp. 18–19, 41; PDF pp. 29–30, 51
Interpretation. PSI authors' average-first recommendation, responsibility attribution, and Frischknecht's footnote 14 dissent
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Sections 4.3.1–4.3.2 and final paragraph of Section 4 (two positions, authors' recommendation, and footnote 14), print pp. 35, 39–40; PDF pp. 45, 49–50
Analytical proposal. Stipulated incremental material output and matched additional service across two electricity-response scenarios
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 4 (resource/capacity constraints), hydropower paragraph on p. 167, and Figures 8–9, print pp. 166–168; PDF pp. 6–8 (context)
Premises referenced (2)
Analytical proposal. Subsystem boundaries, emission factors, and stipulated supply responses for the hypothetical electricity case
Premises referenced (1)
Calculation. Positive-activity baseline and CO₂ inventory for the hypothetical incremental-demand case
Premises referenced (1)
Calculation. Constrained-H scenario: G expansion and net CO₂ increase when H is capped and other users' demand stays fixed
Premises referenced (1)
Calculation. Expandable-H scenario: positive generation activities and net CO₂ increase when H expands and G stays fixed
Premises referenced (1)
Calculation. Conditional comparison between identical contractual attribution and divergent system-level net changes
Premises referenced (2)
Synthesis. Unit-consistent linkage from regional material output changes to regional electricity demand and generation responses
- A Reply to the Aluminium Industry: Each Market Has Its Own Marginal (IJLCA 4(6):309–310 (1999); pp. 2–3 of the same 3-page PDF (upper half of p. 310 only)) — Reply, both columns (regional grids and multiple marginals), print p. 309; PDF p. 2
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 6 (Identification of the Competing Product), print p. 168; PDF p. 8
Premises referenced (2)
Analytical proposal. Empirical verification checklist derived from competing market-response models
- Marginal Production Technologies for Life Cycle Inventories (IJLCA 4(1):48–56 (1999); original title-page author order: Weidema, Frees, Nielsen; DOI 10.1007/BF02979395) — Box 2 and Section 2(b) (direct supply, hydropower, and green electricity paragraphs), print pp. 49–51; PDF pp. 2–4
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Section 7(a)–(e) with continuation on p. 170, and Section 5 (feedback paragraph), print pp. 168–170; PDF pp. 8–10
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Sections 8–9 and Figure 10, print pp. 170–171; PDF pp. 10–11 (qualifies)
Premises referenced (3)
Synthesis. Three conditional convergences: goal dependence, double-counting prevention, and substitution burden of proof
- Normative ethics and methodology for life cycle assessment (JCP 13:1225–1234, 2005; DOI 10.1016/j.jclepro.2005.05.010; accepted 2004-08-04, online 2005-06-22) — Print pp. 1227–1228; PDF pp. 3–4; Sections 2.1–2.2
- ILCD Handbook — General guide for Life Cycle Assessment — Detailed guidance (First edition, March 2010; EUR 24708 EN; JRC48157; DOI 10.2788/38479; ISBN 978-92-79-19092-6) — Section 5.3, Table 2 (pp. 36–41); Sections 6.5.4.3–6.5.4.4 and Provisions I.b–I.c, footnote 64 (pp. 85–87, 92–93); Section 7.2.4, Figure 21 (pp. 165–166)
- Overview and methodology: Data quality guideline for the ecoinvent database version 3 (final) (ecoinvent Report No. 1(v3) (final version 2013-05-06, 169-page official PDF, printed main text pp. 1–161)) — Sections 14.3 and 14.5–14.6.1 (pp. 112, 124–126) and Section 15.1 (pp. 137–138)
- Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods to measure and communicate the life cycle environmental performance of products and organisations (15 December 2021; English corrigendum/republication CELEX 32021H2279R(01), OJ L 144, 23 May 2022) — Annex I, Section 4.4.2, Table 5 (OJ L 471, pp. 238–241)
- Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods to measure and communicate the life cycle environmental performance of products and organisations (15 December 2021; English corrigendum/republication CELEX 32021H2279R(01), OJ L 144, 23 May 2022) — Annex I, Section 4.5, footnotes 42–43, corrigendum reprint OJ L 144/69–70 (PDF pp. 69–70)
Caveats: Conditional convergence covers basic accounting discipline and does not harmonize national certificate regimes or evidentiary sufficiency thresholds for marginal identification.
Premises referenced (3)
Synthesis. Framework divergence on decision-context classification and capacity-replacement scale thresholds
- ILCD Handbook — General guide for Life Cycle Assessment — Detailed guidance (First edition, March 2010; EUR 24708 EN; JRC48157; DOI 10.2788/38479; ISBN 978-92-79-19092-6) — Section 5.3, Table 2 (pp. 36–41); Sections 6.5.4.3–6.5.4.4 and Provisions I.b–I.c, footnote 64 (pp. 85–87, 92–93); Section 7.2.4, Figure 21 (pp. 165–166)
- Overview and methodology: Data quality guideline for the ecoinvent database version 3 (final) (ecoinvent Report No. 1(v3) (final version 2013-05-06, 169-page official PDF, printed main text pp. 1–161)) — Sections 14.3 and 14.5–14.6.1 (pp. 112, 124–126) and Section 15.1 (pp. 137–138)
- Product Life Cycle Accounting and Reporting Standard (GHG Protocol) (September 2011 (ISBN 978-1-56973-773-6, 148-page official PDF)) — Sections 5.1–5.2 and Box 5.1 (pp. 21–22); Sections 9.1–9.3.2, Tables 9.1–9.2, and Figure 9.2 (pp. 61–67); Section 11.3.2 (p. 91)
- Product Life Cycle Accounting and Reporting Standard (GHG Protocol) (September 2011 (ISBN 978-1-56973-773-6, 148-page official PDF)) — Sections 1.5 and 5.3.2, and Appendix A, Tables A.1–A.2 (pp. 6, 23–24, 115–116)
Caveats: ILCD Situation B's "large-change" threshold depends on estimating annual replacement capacity for affected processes, while ecoinvent v3's 30-year / 3.33% rule is a uniform database default; both can deviate from actual equipment lifetimes in specific industries.
Premises referenced (4)
Synthesis. Divergence across physical trade balances, contractual residual mixes, and long-term marginal electricity models
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Definitions of M1–M4, T1, and T3–T5, print pp. 9–12, 18–19; PDF pp. 20–23, 29–30
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — Sections 4.3.1–4.3.2 and final paragraph of Section 4 (two positions, authors' recommendation, and footnote 14), print pp. 35, 39–40; PDF pp. 45, 49–50
- Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods to measure and communicate the life cycle environmental performance of products and organisations (15 December 2021; English corrigendum/republication CELEX 32021H2279R(01), OJ L 144, 23 May 2022) — Annex I, Section 4.4.2, Table 5 (OJ L 471, pp. 238–241)
- Life cycle inventories of electricity generation and power supply in version 3 of the ecoinvent database—part II: electricity markets (Int. J. Life Cycle Assess. 21:1255–1268 (2016), publisher version of record, first published online 2014-01-28) — Sections 2.3.1–2.3.2 and Table 2 footnotes, pp. 1260–1262 (qualifies)
- The integration of long-term marginal electricity supply mixes in the ecoinvent consequential database version 3.4 and examination of modeling choices (Published online 2018-12-11; Vol. 24, pp. 1409–1428 (August 2019); original journal article with Electronic Supplementary Material (DOCX and 7z)) — pp. 1411–1415 (PDF pp. 3–7), Section 2.1, Eq. (1), Table 1, and Sections 2.1.2–2.1.3
Caveats: PEF's contractual tracking hierarchy prevents attributional double counting on paper but does not test whether certificate purchases trigger additional renewable capacity; ecoinvent v3 long-term marginal electricity likewise cannot substitute for hourly dispatch and load-shifting analyses examined in the next chapter.
Premises referenced (3)
Synthesis. Divergence on co-product substitution, the Circular Footprint Formula, and avoided-emission prohibitions under demand changes
- Overview and methodology: Data quality guideline for the ecoinvent database version 3 (final) (ecoinvent Report No. 1(v3) (final version 2013-05-06, 169-page official PDF, printed main text pp. 1–161)) — Sections 14.3 and 14.5–14.6.1 (pp. 112, 124–126) and Section 15.1 (pp. 137–138)
- ILCD Handbook — General guide for Life Cycle Assessment — Detailed guidance (First edition, March 2010; EUR 24708 EN; JRC48157; DOI 10.2788/38479; ISBN 978-92-79-19092-6) — Section 6.5.4, Provisions I.a.ii–iv and vi, and footnotes 57–63, pp. 88–92
- Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods to measure and communicate the life cycle environmental performance of products and organisations (15 December 2021; English corrigendum/republication CELEX 32021H2279R(01), OJ L 144, 23 May 2022) — Annex I, Section 4.5, footnotes 42–43, corrigendum reprint OJ L 144/69–70 (PDF pp. 69–70)
- Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods to measure and communicate the life cycle environmental performance of products and organisations (15 December 2021; English corrigendum/republication CELEX 32021H2279R(01), OJ L 144, 23 May 2022) — Annex I, Sections 4.4.8.2–4.4.8.3 (parameters A and B) and Section 4.4.8.14 (energy recovery), OJ L 144/55–56, 63 (PDF pp. 55–56, 63)
- Product Life Cycle Accounting and Reporting Standard (GHG Protocol) (September 2011 (ISBN 978-1-56973-773-6, 148-page official PDF)) — Sections 5.1–5.2 and Box 5.1 (pp. 21–22); Sections 9.1–9.3.2, Tables 9.1–9.2, and Figure 9.2 (pp. 61–67); Section 11.3.2 (p. 91)
Caveats: Detailed mathematical treatments of co-product allocation/substitution and recycling appear in Joint Production and Material Recycling Chains; this paragraph focuses on how market-constraint identification drives institutional divergence across frameworks.
Premises referenced (3)
Synthesis. Conditions under which framework switches invert option rankings and create reverse-distortion risks
- Normative ethics and methodology for life cycle assessment (JCP 13:1225–1234, 2005; DOI 10.1016/j.jclepro.2005.05.010; accepted 2004-08-04, online 2005-06-22) — Sections 3.2 and 4.2, pp. 1229, 1231 (PDF pp. 5, 7)
- Strommix in Ökobilanzen: Auswirkungen der Strommodellwahl für Produkt- und Betriebs-Ökobilanzen (PSI Bericht 98-17; cover dated December 1998, inner title page dated November 1998; primary electricity/mix data from 1995; 125-page scanned PDF) — M3 formula in T1, Table A.1 (Switzerland 1995 row), and Table A.3 (Switzerland column), print pp. 12, 88, 90; PDF pp. 23, 93, 95
- Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods to measure and communicate the life cycle environmental performance of products and organisations (15 December 2021; English corrigendum/republication CELEX 32021H2279R(01), OJ L 144, 23 May 2022) — Annex I, Section 4.4.2, Table 5 (OJ L 471, pp. 238–241)
- Overview and methodology: Data quality guideline for the ecoinvent database version 3 (final) (ecoinvent Report No. 1(v3) (final version 2013-05-06, 169-page official PDF, printed main text pp. 1–161)) — Sections 14.3 and 14.5–14.6.1 (pp. 112, 124–126) and Section 15.1 (pp. 137–138)
- The integration of long-term marginal electricity supply mixes in the ecoinvent consequential database version 3.4 and examination of modeling choices (Published online 2018-12-11; Vol. 24, pp. 1409–1428 (August 2019); original journal article with Electronic Supplementary Material (DOCX and 7z)) — pp. 1411–1415 (PDF pp. 3–7), Section 2.1, Eq. (1), Table 1, and Sections 2.1.2–2.1.3
Caveats: The 40-fold ratio (8 kg versus 0.2 kg) stems from this chapter's fixed-factor teaching example to illustrate directional mechanism rather than to predict an empirical grid multiplier.
Premises referenced (5)
Synthesis. Empirical evidence gaps in real-world market responses, database implementation sensitivity, and verification boundaries
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Sections 8–9 and Figure 10, print pp. 170–171; PDF pp. 10–11
- ILCD Handbook — General guide for Life Cycle Assessment — Detailed guidance (First edition, March 2010; EUR 24708 EN; JRC48157; DOI 10.2788/38479; ISBN 978-92-79-19092-6) — Section 5.3, Table 2 (pp. 36–41); Sections 6.5.4.3–6.5.4.4 and Provisions I.b–I.c, footnote 64 (pp. 85–87, 92–93); Section 7.2.4, Figure 21 (pp. 165–166)
- Overview and methodology: Data quality guideline for the ecoinvent database version 3 (final) (ecoinvent Report No. 1(v3) (final version 2013-05-06, 169-page official PDF, printed main text pp. 1–161)) — Sections 14.3 and 14.5–14.6.1 (pp. 112, 124–126) and Section 15.1 (pp. 137–138)
- The integration of long-term marginal electricity supply mixes in the ecoinvent consequential database version 3.4 and examination of modeling choices (Published online 2018-12-11; Vol. 24, pp. 1409–1428 (August 2019); original journal article with Electronic Supplementary Material (DOCX and 7z)) — Springer ESM1 DOCX, SI.5 List of known issues ecoinvent consequential version 3.4 (qualifies)
Caveats: Empirical gaps do not render modeling useless; rather, they require reporting attributional ledgers and consequential scenarios distinctly while exposing untested market-response assumptions to readers and reviewers.
Premises referenced (3)
Synthesis. Distinct evidentiary scopes of average-share recomputation, conditional response calculations, and real-world supply evidence
- System boundaries and input data in consequential life cycle inventory analysis (IJLCA 9(3):161–171 (2004); printed DOI 10.1065/lca2004.03.148; current publisher DOI 10.1007/BF02994190) — Sections 8–9 and Figure 10, print pp. 170–171; PDF pp. 10–11 (qualifies)
Premises referenced (5)
Chapter 10 Joint Production
Opens Part III by separating attributional accounting from consequential system response across all four domains before examining how a batch of co-products shares emissions, shifts reference supply, and meets framework rule boundaries.
Chapter 12 Electricity Systems